Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Everyone is a gangster (Rajdhani, Shatabdi, Tejas) until the real Gangsta (Vande Bharat) walks in 😂 - Mushfique Khalid

Search Forum
<<prev entry    next entry>>
Blog Entry# 5905126
Posted: Dec 08 2023 (16:44)

6 Responses
Last Response: Dec 09 2023 (05:55)
सिंधिया ने कहा, '2023 में 23 वंदे भारत ट्रेनें चल रही हैं। 2047 तक 4,500 वंदे भारत एक्सप्रेस ट्रेनें चलाने का टारगेट है।' उन्होंने कहा कि...

1 Posts

10977 views
1

Dec 08 2023 (17:13)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 5905126-2              
He meant 4500 rakes in 25 yrs that is 200 rakes or 3200 coaches per year on an avg which is the present coach production capacity of all 3 manufacturing units.
Translate to English
Translate to Hindi

Rail News
9746 views
0

Dec 08 2023 (17:28)
Gaiblush
Gaiblush   16 blog posts
Re# 5905126-3              
I doubt the plan... in the last one year we got only 32 Vande Bharat and as per the statement 4500 Vande Bharat trains in 23 years which means approximately 200 trains in a year. This does not sound a perfect plan at the current rate. It is only possible if we increase manufacturing of such trains in pan India rail coach factories
Translate to English
Translate to Hindi

10246 views
0

Dec 08 2023 (17:30)
Vipankumar~
Vipankumar~   1912 blog posts
Re# 5905126-4              
200 rakes per year current capacity,. What???
Translate to English
Translate to Hindi

8550 views
0

Dec 08 2023 (21:46)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 5905126-5              
In 2023-24 the LHB coaches Target is 5000 coaches and train set 2000 coaches making Total 7000 coaches. In 2024-25 the target is 7700 coaches. In future in place of LHB coaches they will shift to manufacture more VB sets. I have attached the coach production plan.
Translate to English
Translate to Hindi

6468 views
0

Dec 09 2023 (05:55)
deepak.yerr~
deepak.yerr~   6105 blog posts
Re# 5905126-6               Past Edits
The production target of VB coaches in 2023-24 is 744 coaches and 2024-25 is 1008.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy