Search Forum
Blog Entry# 5967622
Posted: Feb 12 (11:18)
No Responses Yet
No Responses Yet
Feb 12 (11:18) 17229/Sabari Express (PT) | TVC/Thiruvananthapuram Central (Trivandrum) (5 PFs)
GK
GK 231 blog postsDe-link the RSA of Sabari with Padmavathi group and give RSA of both Sabari and Charminar by shifting them to SR TVC Div with PM at TVC and SM at NCJ.
since there is propsal to extend Charminar to Cape. Since both of them requires a Pantry (6 Rakes){1555+1594}.
6.45(TVC) β 17229 β 13.30/18.00(HYB) β 12760 β 7.00/7.10(MS) β 20.30/6.00(CAPE)...
more...
since there is propsal to extend Charminar to Cape. Since both of them requires a Pantry (6 Rakes){1555+1594}.
6.45(TVC) β 17229 β 13.30/18.00(HYB) β 12760 β 7.00/7.10(MS) β 20.30/6.00(CAPE)...
more...