Search Forum
Blog Entry# 5974165
Posted: Feb 19 (20:52)
9 Responses
Last Response: Feb 21 (08:05)
9 Responses
Last Response: Feb 21 (08:05)
Feb 19 (20:52) 18047/Shalimar - Vasco-da-Gama Amaravati Express (PT) | GTL/Guntakal Junction (7 PFs)
LHB_for_18047~
LHB_for_18047~ 10693 blog postsSuch a big slack this train has between GNT to GTL. It easily recovered a 2 hrs delay and arrived GTL 15 minutes BT.
Also because of the slip attachment and detachment at GTL in addition to loco change it had to take a long 50 minutes halt. If slip is cancelled the loco change can be completed in much less time or shifted to UBL.
In the end it reached VSG just 5 minutes late.
This...
more...
Also because of the slip attachment and detachment at GTL in addition to loco change it had to take a long 50 minutes halt. If slip is cancelled the loco change can be completed in much less time or shifted to UBL.
In the end it reached VSG just 5 minutes late.
This...
more...
7 Public Posts - Mon Feb 19, 2024
Crowded means Railways are inefficient in handling the people boarding SL coaches. Anyways Railways can always run an additional weekly train with only SL and GS coaches between HWH and VSG.
More AC coaches are beneficial to both Railways as well as people in general.
A good way to manage excess crowd is reserving the GS coaches in all SF and M/E trains like they did during COVID and reducing the amount of WL allowed.
More AC coaches are beneficial to both Railways as well as people in general.
A good way to manage excess crowd is reserving the GS coaches in all SF and M/E trains like they did during COVID and reducing the amount of WL allowed.
1 Public Posts - Wed Feb 21, 2024