Search Forum
Blog Entry# 5974165
Posted: Feb 19 (20:52)
9 Responses
Last Response: Feb 21 (08:05)
9 Responses
Last Response: Feb 21 (08:05)
Feb 19 (20:52) 18047/Shalimar - Vasco-da-Gama Amaravati Express (PT) | GTL/Guntakal Junction (7 PFs)
LHB_for_18047~
LHB_for_18047~ 10693 blog postsSuch a big slack this train has between GNT to GTL. It easily recovered a 2 hrs delay and arrived GTL 15 minutes BT.
Also because of the slip attachment and detachment at GTL in addition to loco change it had to take a long 50 minutes halt. If slip is cancelled the loco change can be completed in much less time or shifted to UBL.
In the end it reached VSG just 5 minutes late.
This...
more...
Also because of the slip attachment and detachment at GTL in addition to loco change it had to take a long 50 minutes halt. If slip is cancelled the loco change can be completed in much less time or shifted to UBL.
In the end it reached VSG just 5 minutes late.
This...
more...
3 Public Posts - Mon Feb 19, 2024
Amaravati Express already has 10 SL coaches it doesn't need more.
Goa express should be augmented with 2 more SL and 1 more GS coach.
Amaravati Express LHB CC should be like one 1AC, two 2AC, eight 3AC, six SL, two GS, one PC, one SLR and one EOG.
Goa express should be augmented with 2 more SL and 1 more GS coach.
Amaravati Express LHB CC should be like one 1AC, two 2AC, eight 3AC, six SL, two GS, one PC, one SLR and one EOG.
3 Public Posts - Mon Feb 19, 2024
1 Public Posts - Tue Feb 20, 2024
1 Public Posts - Wed Feb 21, 2024