Search Forum
Blog Entry# 599388
Posted: Dec 02 2012 (13:18)
41 Responses
Last Response: Jan 02 2013 (14:53)
41 Responses
Last Response: Jan 02 2013 (14:53)
I think railways must ensure following to ensure timely run of this train..
1. It must be given an Wap5/7 upto patna for better acceleration as it has got man stops enroute..
2. From patna a WDP4 will do the job..
3. An extra rake should be provided.
4....
more...
1. It must be given an Wap5/7 upto patna for better acceleration as it has got man stops enroute..
2. From patna a WDP4 will do the job..
3. An extra rake should be provided.
4....
more...
9 Public Posts - Sun Dec 02, 2012
22 Public Posts - Mon Dec 03, 2012
the solution may arrive in such a way that long distance passing by trains must leave patna by 6 am , during office/shool hours express trains should be avoided to ply on this route,
however the trains originating and terminating at patna should be take care that they are not messing with local office/student timings.
however the trains originating and terminating at patna should be take care that they are not messing with local office/student timings.
4 Public Posts - Mon Dec 03, 2012
2 Public Posts - Tue Dec 04, 2012
1 Public Posts - Sun Dec 16, 2012
2 Public Posts - Wed Jan 02, 2013