Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Yeh dil maange more (RailFans, while ending their trip) - Kirti Solanki

Search Forum
<<prev entry    next entry>>
Blog Entry# 6001523
Posted: Mar 17 (17:14)

4 Responses
Last Response: Mar 21 (16:14)
Imaginary
2182 views
6

Mar 17 (17:14)   IMG22232-2222839/♥♥Bengaluru Cantontment - Kalaburagi Vande Bharat Express (Revamped)♥♥
Udayappa~
Udayappa~   124 img trains   70 popular
632 net green flags   6 green per Train
Entry# 6001523            Tags  
Custom Ratings
Kindly provide your opinions and flag, an attempt to speed up the existing kalaburagi - bengaluru - kalaburagi vande bharat.
.
this route, having a distance of 548 kms, in which 506 kms is double line and 229 kms having an MPS of 130, this much speed up is really needed in my opinion.
Translate to English
Translate to Hindi

2 Posts

840 views
0

Mar 21 (15:55)
irifan2015~
irifan2015~   2342 blog posts
Re# 6001523-4              
Train will be a successful one if there is a link train to Mumbai from KLBG.
CR can extend Siddeshwar to KLBG.
BNC 1440 KLBG 2210 ; KLBG DEP 2245 CSMT 0730.
CSMT 2030 KLBG 0530; KLBG 0600 BNC 1330.
Translate to English
Translate to Hindi

713 views
0

Mar 21 (15:58)
Sameer2905^~
Sameer2905^~   15620 blog posts
Re# 6001523-5               Past Edits
If doing that there r chances of Siddeshwar getting delayed unless it has been having arrival at SUR on time and then extn to KLBG...👍 If it has very good arrival SUR then it can be extn to KLBG and ppl can board the KLBG SMVB/BNC VB and head to BLR...👍
Translate to English
Translate to Hindi

670 views
1

Mar 21 (16:06)
HarshaI22159^~
HarshaI22159^~   10246 blog posts
Re# 6001523-6              
Siddheshwar is having PM @SUR with Udyan, so 0 chances of Extension
Translate to English
Translate to Hindi

781 views
0

Mar 21 (16:14)
irifan2015~
irifan2015~   2342 blog posts
Re# 6001523-7              
My point is that only. Both SUR and KLBG are in CR. Siddeshwar has RSA with Udyan.
So, Siddeshwar can have it's PM at KLBG and run as KLBG CSMT. Can run as Udyan and go back as Udyan to Mumbai and further to KLBG as Siddeshwar.
KLBG CSMT (Siddeshwar) -- CSMT SBC (Udyan) -- SBC CSMT (Udyan) -- CSMT KLBG (Siddeshwar).
Win
...
more...
win for all.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy