Search Forum
Blog Entry# 6009990
Posted: Mar 26 (21:06)
20 Responses
Last Response: Mar 27 (21:04)
20 Responses
Last Response: Mar 27 (21:04)
Rake standardized for Goa Express but with Max 20 CC ( No Standardization with 22 LHB CC, Disappointing).
.
.
.
PR Link : click here
.
.
.
PR Link : click here
8 Public Posts - Tue Mar 26, 2024
4 Public Posts - Wed Mar 27, 2024
This CC is absolutely worse. Instead of reducing AC coaches they should have removed those two parcel vans and increased total no. of coaches to 22 by adding another SL and GS.
Why the hell does SWR want to cram 2 parcel vans in such a high in demand train. 3AC in this train was a hit always going full. There was no need to reduce 3AC also why the hell 4 GS and 2 EOG ?
It could have been 3 GS and 1 SLR and EOG each. This is a...
more...
Why the hell does SWR want to cram 2 parcel vans in such a high in demand train. 3AC in this train was a hit always going full. There was no need to reduce 3AC also why the hell 4 GS and 2 EOG ?
It could have been 3 GS and 1 SLR and EOG each. This is a...
more...
7 Public Posts - Wed Mar 27, 2024