Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Amritsar Jan Seva Express: हम मजदूर है साहब! - Piyush Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 6014203
Posted: Mar 30 (20:35)

1 Responses
Last Response: Apr 03 (07:36)
Rail News
3823 views
0

IR Affairs
Mar 30 (20:35)   Unnao Junction Track Undergoes Repairs for High-Speed Trains

Exynos9611~   18881 news posts
Entry# 6014203   News Entry# 546662         Tags   Past Edits
Unnao News: हाईस्पीड ट्रेन के लायक बनाया जा रहा रेलवे ट्रैक

Indian Railways is upgrading the Kanpur-Lucknow rail route to accommodate high-speed trains. On Friday, a two-hour block was imposed at Unnao Junction's platform number 2 for track repairs. The repairs included track packing, ballast cleaning, rail replacement, and track geometry testing. The block was from 10:15 am to 12:15 pm, during...
more...
which trains were routed through the down line at a reduced speed. Similar repair work will be carried out at other crossings on the Lucknow-Kanpur route in the coming days.

High-speed train ke liye Kanpur-Lucknow rail route ko upgrade karne ke liye, Indian Railways ab Unnao Junction ke track ko durust kar raha hai. Shukravaar ko, platform number 2 pe do ghante ka block lagake track ki marammat ki gayi. Isme track packing, gitti ki chhanai, patariyon ki marammat aur badalne...
more...
ka kaam kiya gaya. Machine se track geometry testing bhi kiya gaya. 10:15 se 12:15 tak block tha, aur trainon ko dhimi raftaar se down line se nikala gaya. Aane wale dinon mein, Lucknow-Kanpur route ki aur crosssing pe bhi marammat ka kaam hoga.

Rail News
2435 views
3

Apr 03 (07:36)
AdityaUnnao
AdityaUnnao   98 blog posts
Re# 6014203-1               Past Edits
Har 3-4 mahine me ye railway Wale same location pe same kaam krte h jabki aajtak ye section 110 se 160 nhi ho paaya h.
Maine Delhi Agra 160 KMPH section pe har kuch din me track replacement, ballast cleaning aur maintenance ka kaam hote nhi dekha.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy