A new Andal bypass line is under construction near Bakhtarnagar cabin. The line on far left is the new line.
9 Posts
Yes adding a extra RORO service at the Khana link cabin to the UP slow line in the BWN-ASN section, would definitely bolster connectivity with Shantiniketan area with the Shipanchal area.
Another thing that has to be done ASAP is the alternate DC line being built quickly so that the train services between DHN & RNC can be seamless and increased in load. The existing line is on it's last leg and more and more services are being introduced on this line.
...
more...
Another thing that has to be done ASAP is the alternate DC line being built quickly so that the train services between DHN & RNC can be seamless and increased in load. The existing line is on it's last leg and more and more services are being introduced on this line.
...
more...
New alignment for the DC line should be the top most priority of RB.
For the new DC line, bypass at GMO is being considered. But the main bottleneck is the river bridge near CRP, which slows trains down considerably.
RNG halt for RPH-ASN trains needed DGR passengers will get access.
That is a long way from now, let the line get completed and commissioned first !