Search Forum
Blog Entry# 6044609
Posted: Apr 26 (14:02)
13 Responses
Last Response: Apr 27 (20:36)
13 Responses
Last Response: Apr 27 (20:36)
A new Andal bypass line is under construction near Bakhtarnagar cabin. The line on far left is the new line.
8 Public Posts - Fri Apr 26, 2024
Yes adding a extra RORO service at the Khana link cabin to the UP slow line in the BWN-ASN section, would definitely bolster connectivity with Shantiniketan area with the Shipanchal area.
Another thing that has to be done ASAP is the alternate DC line being built quickly so that the train services between DHN & RNC can be seamless and increased in load. The existing line is on it's last leg and more and more services are being introduced on this line.
...
more...
Another thing that has to be done ASAP is the alternate DC line being built quickly so that the train services between DHN & RNC can be seamless and increased in load. The existing line is on it's last leg and more and more services are being introduced on this line.
...
more...
2 Public Posts - Fri Apr 26, 2024
2 Public Posts - Sat Apr 27, 2024