Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailFans - हमको देख देख दुनिया जले, हमको ज़माने से क्या

Search Forum
<<prev entry    next entry>>
Blog Entry# 6050365
Posted: May 01 (22:24)

No Responses Yet
Rail News
27108 views
0

Major Accidents/Disruptions
WR/Western
May 01 (22:24)   Crane Collapse Injures Engineer and Operator During Ratlam-Neemuch Railway Line Doubling Project

AdittyaaSharma^~   73681 news posts
Entry# 6050365         Tags   Past Edits
Ratlam News: रतलाम जिले में मलेनी रेलवे ब्रिज का गर्डर चढ़ा रही क्रेन का बूम टूटा, दो घायल

On Wednesday evening, a crane's boom collapsed during the construction of a bridge over the Maleni River in Halduni as part of the Ratlam-Neemuch railway line doubling project. This resulted in injuries to the site engineer, Prashant Shekhar (29), and the crane operator, Ashish (40). The incident occurred while a girder...
more...
was being lifted onto the bridge. The collapse is suspected to be due to overloading the wire holding the girder. Both injured individuals are receiving treatment at the government medical college. The project, which aims to double the railway line between Ratlam and Chittorgarh, is expected to be completed by March 2025. It includes the renovation of 18 stations, 31 major bridges, and 133 smaller bridges. The project involves a 63.94 km section from Neemuch to Dalauda and a 68.98 km section from Dalauda to Ratlam. Currently, the single railway line is experiencing a 150% load. The project is being executed by the MBPL and PGIPL companies.

Ratlam-Neemuch railway line doubling project mein Halduni mein Maleni river par bridge banaate waqt, Wednesday evening ko crane ka boom tut gaya. Crane girder chadha rahi thi, isse site engineer, Prashant Shekhar (29), aur crane operator, Ashish (40), injured ho gaye. Girder ko bandhne wale wire pe overload hone...
more...
se boom tutne ka suspect hai. Dono injured ko government medical college mein treatment mil raha hai. March 2025 tak Ratlam se Chittorgarh tak double line hone wali hai. 18 stations ka renovation, 31 bade bridges, aur 133 chhote bridges banenge. Neemuch se Dalauda tak 63.94 km aur Dalauda se Ratlam 68.98 km section hai. Single line par abhi 150% load hai. MBPL aur PGIPL companies project par kaam kar rahi hain.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy