Search Forum
Blog Entry# 6068080
Posted: May 18 (09:17)
No Responses Yet
No Responses Yet
today I traveling WRS to KIUL in GAYA JHAJHA PSGR. I see this train in all coches no any one fan running I don't know why and KG line all psgr train following before 2015 TT that time slow track and DO eng use. now electric dual tracks and tracks speed also increse than why not reduce TT. if time reduce than 1 racks possible to run 2 time up and 2 time down in same day or better to increse coches minimum 15 coches without any extra coch requrment.