Search Forum
Blog Entry# 6078296
Posted: May 28 (21:52)
1 Responses
Last Response: May 28 (22:12)
1 Responses
Last Response: May 28 (22:12)
Once VB Sleeper train sets are available, will CR, WR/SWR consider running them as a Duronto type train between Bengaluru & Mumbai with a run time of 18h & limited 5,6 stops?
IMHO, it is possible even today if one follows the Push-Pull Rajdhani model with 2 WAP7s dedicated to each rake. Key is to introduce a daily train that is faster than the current options 🙏🏾
IMHO, it is possible even today if one follows the Push-Pull Rajdhani model with 2 WAP7s dedicated to each rake. Key is to introduce a daily train that is faster than the current options 🙏🏾
Just like dozens of scr,swr trains cancelled due to CR operational constraints there can't be hope of scope with swr and apathy among scr route