Search Forum
Blog Entry# 6079261
Posted: May 30 (07:01)
16 Responses
Last Response: May 31 (10:22)
16 Responses
Last Response: May 31 (10:22)
Hi friends
I have a doubt which can be clarified by all seniors here.
Is it possible a train to start from VSKP and go to SGRL (Singrauli) via Ranchi and halt there for 3 hrs and to start again as a new train to SC via Anuppur have a SM there and then go to VSKP. If this has to do as Tri-Weekly how many rakes needed? Is this best to save rakes or to give 2 rakes each to VSKP and SC to run as Tri-Weekly as separate trains? And if...
more...
I have a doubt which can be clarified by all seniors here.
Is it possible a train to start from VSKP and go to SGRL (Singrauli) via Ranchi and halt there for 3 hrs and to start again as a new train to SC via Anuppur have a SM there and then go to VSKP. If this has to do as Tri-Weekly how many rakes needed? Is this best to save rakes or to give 2 rakes each to VSKP and SC to run as Tri-Weekly as separate trains? And if...
more...
17 Posts
Any thing is very much possible. Only thing is political support needed
Yes an atleast 80%polititions are dam lazy fools who woke at the time of elections.
There's no need to run daily train to Singrauli or they require full 22 coach train. An 18 coach overnight triweekly to Tatanagar and Ranchi is more then enough. In 2013 they have introduced number of weekly trains and all if them have RSA. All the trains are successfull and require frequency increase
1. Remove RSA of both Chennai express and make them daily with 2 rakes.
2. Remove RSA of Kollam express and make it Biweekly
3....
more...
1. Remove RSA of both Chennai express and make them daily with 2 rakes.
2. Remove RSA of Kollam express and make it Biweekly
3....
more...
What I want with 2 Rakes I can run 2 trains as weekly VSKP-SGRL/SGRL-SC RETURN SC-SGRL/SGRL- VSKP that is my an SGRL not at all connected either to VSKP or SC
Vskp doesn't require Singrauli connection. If Singrauli needs connection to Hyd then Ranchi division should plan connection via or from nearest base station. Vskp division has lot of requirements in many sectors which it's losing to bus sector. It cannot waste rakes and PM slots for other connections.