Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

For RailFans, Platform Announcements are more musical than Bollywood songs. - Prince Maan

Search Forum
<<prev entry    next entry>>
Blog Entry# 6106452
Posted: Jun 26 (18:02)

47 Responses
Last Response: Jun 29 (12:16)
General Travel
46662 views
8

Jun 26 (18:02)  
Arya.Rishav~
Arya.Rishav~   3421 blog posts
Entry# 6106452              
So Now VB going to be as SF mail Exp speed.
then why it was launch,? why spoiled all major Mail/Exp trains?
Translate to English
Translate to Hindi

10 Public Posts - Wed Jun 26, 2024

9 Public Posts - Thu Jun 27, 2024

4647 views
4

Jun 27 (11:23)
WAP5CLW
WAP5CLW   95 blog posts
Re# 6106452-25              
2 compliments
Useful Useful
Nothing of that sort. When TPWS was installed, it worked well for 150KMPH ops on the route. Infact GZB shed had nominated 3 WAP-5,s initially which has got the TPWS equipment installed. They were used for these high-speed ops. Locos / LHB rake for Bhopal Shatabdi/Gatimaan were maintained at New Delhi. The exact high-speed section is from Tughlakabad to Raja Ki Mandi. But then being an electrical software system, it needed upgrades/patch updates. Which was not done. You know how bureaucracy works. See once CRS gave approval to run the train at 150/160KMPH who cared. Anyways it was a small section of 170/180 odd kms. And drivers were confident of driving at such speed because they have been selected from the best of the lot. Yes from Agra all the way till Lalitpur the speed was 130KMPH post which till Bhopal it was 120 Kmph. ...
more...


IR has never been an expect at raising avg speeds and top speeds because they were more focused on increasing haulage capacity both for passenger and freight.

When Bhopal Shatabdi was launched in 1988 CLW upgraded 5 WAP-1, s with flexi coil bogies called them WAP-3. The objective was to run train at 140Kmph between NDLS and Agra. It did but then bogies developed cracks. Therefore, after some time. in early 90, s Shatabdi was slowed down by 45 mins/1hr and WAP-3 went for POH and re-converted to WAP-1 class.

So high speed has never been IR forte. True high speed you see today is in RRTS as on date and offcourse bullet train when they start operating

Translate to English
Translate to Hindi

21 Public Posts - Thu Jun 27, 2024

4 Public Posts - Fri Jun 28, 2024

2 Public Posts - Sat Jun 29, 2024
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy