पूर्व मध्य रेल में 244 आरओबी एवं 383 आरयूबी कार्यरतTo ensure safe and smooth travel for passengers on road and rail networks, the East Central Railway (ECR) is constructing Road Over Bridges (ROBs) and Road Under Bridges (RUBs) at level crossing gates. Currently, ECR has 244 operational ROBs and 383 RUBs across its jurisdictions. This includes 130 ROBs and 141...
more... RUBs in Dhanbad Division, 40 ROBs and 60 RUBs in Pandit Deen Dayal Upadhyay Division, 39 ROBs and 66 RUBs in Danapur Division, 15 ROBs and 55 RUBs in Sonpur Division, and 20 ROBs and 61 RUBs in Samastipur Division. Additionally, 109 ROBs and 304 RUBs are under construction. These include 22 ROBs and 57 RUBs in Dhanbad Division, 27 ROBs and 21 RUBs/HHS in Pandit Deen Dayal Upadhyay Division, 16 ROBs and 15 RUBs in Danapur Division, 12 ROBs and 11 RUBs in Sonpur Division, and 32 ROBs and 10 RUBs in Samastipur Division.
East Central Railway (ECR) mein road aur rail par passengers ke safe aur smooth travel ke liye level crossing gates pe ROB (Road Over Bridge) aur RUB (Road Under Bridge) banae jaa rahe hain. Aaj ke din, ECR ke under 244 ROBs aur 383 RUBs work kar rahe hain. ...
more... Isme Dhanbad Division mein 130 ROBs aur 141 RUBs, Pandit Deen Dayal Upadhyay Division mein 40 ROBs aur 60 RUBs, Danapur Division mein 39 ROBs aur 66 RUBs, Sonpur Division mein 15 ROBs aur 55 RUBs, aur Samastipur Division mein 20 ROBs aur 61 RUBs include hain. Iske alawa 109 ROBs aur 304 RUBs banne wale hain. Inme Dhanbad Division mein 22 ROBs aur 57 RUBs, Pandit Deen Dayal Upadhyay Division mein 27 ROBs aur 21 RUBs/HHS, Danapur Division mein 16 ROBs aur 15 RUBs, Sonpur Division mein 12 ROBs aur 11 RUBs, aur Samastipur Division mein 32 ROBs aur 10 RUBs banae jaayenge.