Central Budget Allocations for RAMESWARAM DHANUSHKODI RAILWAY LINE TILL DATE.
2019 = 1 lakh
2020 = 3 crores
2021 = 75 crores
2022...
more...
2019 = 1 lakh
2020 = 3 crores
2021 = 75 crores
2022...
more...
2 Public Posts - Sat Jul 27, 2024
The line will have to be built and maintained on unstable terrain and tidal waves to contend with. There is no provision for electricity in the area as well.
There are no residents and only a limited number of shops are currently allowed during the day to cater to the tourists and everybody leaves after sunset.
Rather,...
more...
There are no residents and only a limited number of shops are currently allowed during the day to cater to the tourists and everybody leaves after sunset.
Rather,...
more...
5 Public Posts - Fri Aug 02, 2024