Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Sapt Kranti Express: Ruling the tracks with EMD Power - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 6138030
Posted: Jul 27 (19:55)

3 Responses
Last Response: Jul 28 (15:41)
Rail News
27467 views
5

WR/Western
Jul 27 (19:55)   Electrification work on Ahmedabad-Udaipur railway line progressing well: NWR PCEE inspects project

riz339~   383 news posts
Entry# 6138030         Tags   Past Edits
ઈલેક્ટ્રીફીકેશનની કામગીરીનું નિરીક્ષણ:રાજસ્થાનના ડુંગરપુરથી હિંમતનગર સુધી NWRની OHE કારમાં PCEE ઈલેક્ટ્રીફીકેશનની કામગીરીનું નિરીક્ષણ કરાયું

The electrification work on the railway line between Ahmedabad and Udaipur is progressing well. The work from Asarva to Himmatnagar has been completed and trials have been conducted. Currently, cabling is being done between Himmatnagar railway station and the outer point. The electrification work from Udaipur to Shamlaji is complete and...
more...
charged, while 80% of the cabling work between Shamlaji and Himmatnagar has been completed. The Principal Chief Electrical Engineer (PCEE) of the North Western Railway (NWR) inspected the ongoing electrification work from Dungarpur in Rajasthan on Saturday. After inspecting the work between Shamlaji and Himmatnagar, the PCEE reached Himmatnagar railway station in the evening. The electrification work is expected to be completed within the next two months.

Ahmedabad se Udaipur railway line pe electrification ka kaam aage badh raha hai. Asarva se Himmatnagar tak ka kaam pura ho gaya hai aur trials bhi ho gaye hai. Abhi Himmatnagar railway station se outer point tak cabling ka kaam chal raha hai. Udaipur se Shamlaji tak electrification ka kaam pura...
more...
ho gaya hai aur charge bhi kar diya gaya hai. Shamlaji se Himmatnagar tak 80% cabling ka kaam pura ho gaya hai. Railway crossing ke aas paas kaam baaki hai. Aage aane wale do mahino mein Asarva se Udaipur tak electrification ka kaam pura ho jaane ki sambhavna hai.

1 Public Posts - Sat Jul 27, 2024

11578 views
2

Jul 28 (08:44)guest
Re# 6138030-2               Past Edits
Himmatnagar udaipur railway line electrification crs done
Translate to English
Translate to Hindi

1 Public Posts - Sun Jul 28, 2024
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy