Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Gujarat Mail - as good as Undhiyu

Search Forum
<<prev entry    next entry>>
Blog Entry# 6180805
Posted: Sep 06 (15:42)

25 Responses
Last Response: Sep 12 (05:54)
General Travel
20175 views
7

Sep 06 (15:42)  
AbhinavKr^~
AbhinavKr^~   3706 blog posts
Entry# 6180805              
IRI पर चाहे कितनी ही मतभेद हो रहे हो Deogarh- Varanasi / Tata - PNBE वंदे भारत रेल को लेकर , गया जंक्शन पर तो वंदे भारत की बारिश हो रही है ।😂 बिना मांगे ही इतनी सारी VBs मिल रही है।
इन सबको भरने का जिम्मा भी गया जं पर ही आ गया है।

दुमका रांची वंदे भारत तो
...
more...
confirm political move है।

Translate to English
Translate to Hindi

20 Posts

3828 views
0

Sep 11 (12:25)
Sanz~
Sanz~   8570 blog posts
Re# 6180805-21              
Hwh_Gaya VB is 5 hr trip jisko badha ke 6 hr kiya gaya hai. Even Rajdhani covers Hwh Ddu in less than 8 hours wonder why not run Hwh_Ddu Vb. Also better hota agar reverse chala dete. MORNING mein from ddu to avoid Shatabdi.
Translate to English
Translate to Hindi

4236 views
1

Sep 11 (12:42)
Arnab_K~
Arnab_K~   9324 blog posts
Re# 6180805-22              
1 compliments
Agree
Instead of DGHR-BSBS VB, a JSME-BSB VB via MDP,DHN,GAYA would have performed much better.
Have you seen the TT that is given to the DGHR-BSBS VB. The slacks are mind blowing!
HWH-BSB VB would have been a much better prospect than the HWH-GAYA VB. It would have filled up 16 coaches.
I expect the HWH-GAYA VB to receive less patronage atleast upto
...
more...
DHN because 12019 will eat up quite a lot of patronage, particularly as the novelty of the VB gradually wears off.
The TT of 12019/12020 is perfect between HWH-DHN, the GAYA VB is quite likely to suffer due to it running after it.
HWH-DHN should have been done and dusted in 3 hrs. The erstwhile HWH-NDLS Duronto did that stretch in 2 hrs 45 mins with HLHB coaches. The VB coachset with higher MPS and much faster acceleration should do much better...

Translate to English
Translate to Hindi

3392 views
0

Sep 11 (12:49)
RailfanBhartiya   139 blog posts
Re# 6180805-23              
Isn't the proposed TT of this HWH Gaya HWH VB looks like similar of old cancelled Double Decker AC although that was a poor occupancy train I expect VB to have the same case until it gets extended to Patna or Varanasi.Coalfield type intercity train was needed between HWH Gaya of HWH based and a VB from NR/NER based from Varanasi to Howrah.
Translate to English
Translate to Hindi

2974 views
0

Sep 11 (13:12)
Rail_0326~
Rail_0326~   610 blog posts
Re# 6180805-24              
HWH GAYA VB must be extended upto Patna
Translate to English
Translate to Hindi

1928 views
1

Sep 12 (05:54)
Arnab_K~
Arnab_K~   9324 blog posts
Re# 6180805-25              
1 compliments
Agree
Had this proposed train been started from PNBE it would have been a smash hit. There was already a demand for a Reverse VB towards PNBE side, and via the GC it would have been a superb idea.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy