Search Forum
Blog Entry# 621073
Posted: Dec 24 2012 (21:28)
7 Responses
Last Response: Dec 31 2012 (18:58)
7 Responses
Last Response: Dec 31 2012 (18:58)
Dec 24 2012 (21:28) 12259/Sealdah - Bikaner AC Duronto Express
SparshSaxena~
SparshSaxena~ 6497 blog postsWaah, This is Running late by 10 Hours
Expected Arrival at NDLS 21:00 Hrs
Expected Arrival at NDLS 21:00 Hrs
4 Posts
I personally travelled on the Duronto which was supposed to depart from NDLS on 24th Dec. First it was rescheduled to 2.15AM but later got rescheduled to 5.00AM on 25th December. The Station Master of NDLS said there were some technical difficulties, hence the inordinate delay.
True enough, the Loco in charge was not the usual GZB/HWH WAP-7. Instead, the loco-in-charge was a HWH WAP-4 22409.
The train finally reached SDAH on 26th Dec at around 7AM, delayed by about 18hrs 30 mins.
The...
more...
True enough, the Loco in charge was not the usual GZB/HWH WAP-7. Instead, the loco-in-charge was a HWH WAP-4 22409.
The train finally reached SDAH on 26th Dec at around 7AM, delayed by about 18hrs 30 mins.
The...
more...
i was on board 12301 which left kolkata on 24th ,, we crossed ur train near tundla dat day ,, around noon , i guess ,, even 12302 and 12314 were very late dat day ,, they were only about 1.5 hrs ahead of the duronto in same condition