12.69km In First Phase,10 Stations, 96 Round Trips Daily: Mumbai Metro’s Aqua Line In Graphics, Videos | WatchThe first phase of Mumbai's Metro Line 3, also known as the Aqua Line, has officially opened on October 7th, 2024, running from Aarey Colony to the Bandra-Kurla Complex (BKC). This 12.5 km stretch features 10 stations and connects to both terminals of the Chhatrapati Shivaji Maharaj International Airport and Metro...
more... Line 1 at Marol Naka station. It is part of a larger project extending 33.5 kilometers, connecting Colaba to Seepz via Aarey, which is expected to be fully operational by March or May 2025. The Aqua Line boasts 96 daily services between Aarey and BKC, operating with eight trains from 6:30 AM to 10:30 PM, with fares ranging from Rs 10 to Rs 50. It can accommodate up to 650,000 passengers daily and is operated by 48 train captains, including 10 women. The trains are designed to reach speeds of 85 km/h, with an average running speed of 35 km/h. Prime Minister Narendra Modi is expected to inaugurate the Aarey-BKC route in the first week of October, along with other infrastructure projects in Maharashtra.
Mumbai ka Metro Line 3, jisko Aqua Line bhi jaante hain, ka pahla phase aaj, 7 October 2024 ko, officially open ho gaya hai. Ye line Aarey Colony se Bandra-Kurla Complex (BKC) tak jaati hai, aur 12.5 km lambi hai. Ismein 10 stations hain, aur ye Chhatrapati Shivaji Maharaj International Airport...
more... ke dono terminals aur Marol Naka station pe Metro Line 1 se connect hoti hai. Ye ek bade project ka part hai, jiska total length 33.5 km hai, aur jo Colaba se Seepz tak, Aarey se hota hua, jaata hai. Ye poora project March ya May 2025 tak operational ho jaayega. Aqua Line mein Aarey aur BKC ke beech 96 daily services chalti hain, jismein aath trains use ki jati hain. Ye services 6:30 AM se 10:30 PM tak chalti hain, aur ticket ka fare Rs 10 se Rs 50 tak hai. Ye line har din 650,000 passengers ko handle kar sakti hai, aur isko 48 train captains operate karte hain, jismein se 10 ladies hain. Trains ki design 85 km/h ki speed tak ki gai hai, lekin average speed 35 km/h hai. Prime Minister Narendra Modi, October ke pahle hafte mein, Aarey-BKC route ko aur Maharashtra ke kuchh aur infrastructure projects ko inaugurate karenge.