Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

अपनी संपूर्ण क्रांति, राजधानी से कम है के 🔥- Arjun Rai

Search Forum
<<prev entry    next entry>>
Blog Entry# 629461
Posted: Jan 02 2013 (16:22)

83 Responses
Last Response: Jun 04 2013 (15:43)
4 Followers
General Travel
29600 views
13

Jan 02 2013 (16:22)   HYB/Hyderabad Deccan Nampally (6 PFs)
 
WDP 4
WDP 4   367 blog posts
Entry# 629461            Tags  
HYB METRO UPDATE
---
Overhead uninterrupted power line for metro
---
The metro rail project will have an overhead 25 KV power line across the 72-km viaduct being constructed in the three corridors. Initially, the
...
more...
authorities thought of having the power line between the tracks as is prevalent in Europe which also provides an aesthetic look.
But after consulting experts and studying the power systems of some existing metro lines, it was decided to go in for an overhead line, said Hyderabad Metro Rail (HMR) Managing Director N.V.S. Reddy. “We will be striving to come up with a better design to compensate for the overhead traction line,” he said.
Tie-up with Transco
HMR has tied up with APTransco for uninterrupted power supply to the railway traction and also for the stations and depots. About 75 MW of power will be required a day for the project. Transco will be supplying 130 KV power, which will be scaled to 25 KV for the traction. It will 35 KV for the other auxiliary services at the depots/stations.
Four key substations are coming up for the project at Uppal, Miyapur, Yousufguda and Mahatma Gandhi Bus Station (MGBS) Imliban. Construction at the five-acre Uppal site inside the depot is in an advanced stage of completion, while work on the Miyapur substation is set to begin on another five-acre site. These two are the main power receiving stations.
Free land to Transco
It is the same case with the Yousufguda substation where construction is expected to begin soon. Land at MGBS is yet to be delineated and these substations will be on one-acre sites each. Land has been given free to Transco for constructing these facilities with built in redundancies and extra cabling.
“The power supply system is being designed in such a manner that power can be drawn seamlessly from across any of the three corridors in case of a problem or failure on a particular stretch or corridor,” explained Mr. Reddy.
Source: click here

Translate to English
Translate to Hindi

1 Public Posts - Thu Jan 03, 2013

1 Public Posts - Mon Jan 07, 2013

8 Public Posts - Wed Jan 09, 2013

2 Public Posts - Thu Jan 10, 2013

2 Public Posts - Sat Jan 12, 2013

2 Public Posts - Fri Jan 18, 2013

2 Public Posts - Sat Jan 19, 2013

1 Public Posts - Sun Jan 20, 2013

4 Public Posts - Mon Jan 21, 2013

1 Public Posts - Tue Jan 22, 2013

1 Public Posts - Thu Jan 24, 2013

1 Public Posts - Sat Jan 26, 2013

1 Public Posts - Wed Jan 30, 2013

1 Public Posts - Thu Jan 31, 2013

2 Public Posts - Thu Feb 28, 2013

1 Public Posts - Sun Mar 03, 2013

3 Public Posts - Mon Mar 11, 2013

1 Public Posts - Thu Mar 14, 2013

4 Public Posts - Wed Mar 20, 2013

3 Public Posts - Thu Mar 21, 2013

2 Public Posts - Mon Mar 25, 2013

2 Public Posts - Tue Apr 02, 2013

2 Public Posts - Wed Apr 03, 2013

1 Public Posts - Thu Apr 04, 2013

4 Public Posts - Fri Apr 05, 2013

2 Public Posts - Wed Apr 10, 2013

4 Public Posts - Sun Apr 14, 2013

1 Public Posts - Sun Apr 21, 2013

2 Public Posts - Mon Apr 29, 2013

8 Public Posts - Fri May 10, 2013

1 Public Posts - Sat May 11, 2013

2 Public Posts - Tue May 14, 2013

1 Public Posts - Mon May 20, 2013

1 Public Posts - Tue May 21, 2013

1 Public Posts - Sat May 25, 2013

1 Public Posts - Tue May 28, 2013

6388 views
0

May 28 2013 (12:34)
WDP 4   367 blog posts
Re# 629461-78              
Old City properties to be bulldozed for metro.
.
HYDERABAD: Nearly 1,000 properties will be brought down, either partially or completely, for widening the three-kms stretch between Mahatma Gandhi Bus Station (MGBS) and Falaknuma to 100 feet on the metro rail corridor-II (JBS-Falaknuma) route.
.
Officials
...
more...
said that while a major portion of the carriageway was 60 ft wide at present, at some stretches the road narrowed down to 40 to 50 ft. The Greater Hyderabad Municipal Corporation (GHMC) town planning has already completed survey of properties and a road development plan (RDP) was being finalized. "Once the RDP is okayed, we will begin marking properties to be taken over for widening and then the land acquisition process will begin," they said.
.
"The road from MGBS to Falaknuma via Darushifa, Mir Alam Mandi, Haribowli, Shah Ali Banda and Falaknuma is 100 ft in the master plan. However, the road was not widened due to resistance from locals. Now, for the metro rail project, the road expansion will be taken up. The entire process of finalising RDP and marking will take another month," GHMC circle 4 (Charminar) assistant city planner RE Nageshwara Rao told TOI on Monday.
.
The officials admit the number of properties likely to be affected due to widening could be more as the road is very narrow and majority of the properties were in just 50 to 100 sq yards each. The exact number of properties would be known only after the marking process gets over.
.
The Hyderabad Metro Rail (HMR) had initially finalised the 15-km corridor from JBS to Falaknuma via Darulshifa, Haribowli, Shah Ali Banda and Falaknuma. Representatives from the Old City, especially MIM leaders, asked the HMR to avoid the route as many properties, religious structures and heritage buildings will be affected in the road widening. Then, an alternative route was proposed via Salar Jung Museum, the AP high court along the Musi, Bahadurpura, Nehru Zoological Park, Shamsheergunj and Falaknuma.
.
As the length of the corridor would increase to 18 km from the planned 15 km if it takes the alternate route, the HMR sent the proposal to the municipal administration and urban development (MA&UD) department for examination. Sources said the MA&UD has not yet conveyed its decision on the alternative route. "The metro rail project developer L&T has begun works on the JBS-Falaknuma corridor and land acquisition process is progressing at a brisk pace on the Musheerabad-Narayanguda stretch. Except the Sultan Bazaar stretch, land acquisition has almost been completed at most places and demolitions are taking place. Now, the right of way has to be given to the remaining portion of the corridor i.e., in the Old City," an official of the HMR explained.
.
click here

Translate to English
Translate to Hindi

1 Public Posts - Tue May 28, 2013

1 Public Posts - Wed May 29, 2013

3 Public Posts - Tue Jun 04, 2013
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy