Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purvanchal Express - Poorvottar ka Sikandar

Search Forum
<<prev entry    next entry>>
Blog Entry# 67260
Posted: Aug 29 2010 (23:46)

7 Responses
Last Response: Sep 09 2010 (13:24)
1613 views
0
Aug 29 2010 (23:46)  
 
guest   0 blog posts
Entry# 67260              
Can anybody tell me that have electric locos started operated on MGS - BNS and UMB - MB - BE Sections of Uttar Pradesh . The net is not providing any relevant info about these routes . Thanks .
Translate to English
Translate to Hindi

2 Posts

526 views
0

Aug 30 2010 (17:46)
Vinay Kumar   23030 blog posts
Re# 67260-3              
BSB-ALD Main line hasnt got pole erected yet & i dunno about the electrification completion!!
As far as travel timing in between ASR-MGS via MB-BE-LKO-SLN-BSB Trunk route is concerned, nothing extra-ordinary will happen, until LKO-SLN-BSB Track is 100% doubled (its some 55% Double yet)
PS: Shramjeevi is mostly in-time or before while returning from NDLS to Rajgir @ LKO.
It get late for 1-2
...
more...
hours till SLN (Total 140 km from LKO, 75 km single traction).
LKO-BSB Stretch makes train late for 2-4 hours, if they get into single track @ conjested timing!!

Translate to English
Translate to Hindi

493 views
0
Sep 05 2010 (19:02)
guest   0 blog posts
Re# 67260-4              
Mr. Vinay , any idea about the Doubling Status of BSB - ALD Route ?? I have heard that this route is via Jhangai Jn - Gyanpur Road - Allahabad City (ALN ?) . Just like trains go from MGS to ALD usually via Mirzapur (MZP ?) as it's a shorter route compared to via BSB - Kashi , similarly a shorter route should be designed between Mirzapur & Lucknow , so that "Superfast" trains like Himgiri Exp or Punjab Exp can use it like a Superfast Corridor Bypass Line . Like this time can be saved by avoiding the slow speed MGS - BNS - SLN - LKO Line . Such a Superfast Rail Corridor can be built on the lines of the Sarona Bypass which HWH - CSTM Duronto Exp uses to avoid touching Raipur Jn . This rail corridor should not have a single station & should be...
more...
a Double Track Fully Electrified Route with tracks suitable for 170 Kmph Speed Tolerance . Another such route suitable for such type of a corridor can be between Gomoh Jn and Patna Saheb . By this , trains can avoid the slow & robbery proned Jasidih - Madhupur Route . Another route can be between Dankuni & Panagarh to avoid Bardhamman (BWN) . Thanks .

Translate to English
Translate to Hindi

556 views
0

Sep 06 2010 (05:13)
Vinay Kumar   23030 blog posts
Re# 67260-5              
Can u create any corridor for Mirjapur-LKO. It would have to cross BSB-ALD & will have to merge with ALD-RBL-LKO Route somewhere (which is much longer than existing route, with low MPS)
Further, MGS-SLN-LKO Route is Trunk Route & its slow, coz its single & heavily conjested in peak times!!
@@@@@@@@@@@@@@@@@@@@@@
Recently travelled SLN-LKO-NDLS.
SLN-LKO
...
more...
(PNBE-MTJ Exp) - Passenger departed 15 mins before its arrival
Travel Time: 4 hrs.
SLN-Shivnagar - 30 Km: 1 Hour (Halted Shivnagar for 30 Minutes to give crossing to Varuna)
Shivnagar-Sindurva - 30 Km: 1.5 Hour (Halted 45 Min @ Sindurva & Passenger arrived from front & halted. ASR-KOAA overtook that passenger & crossed PNBE-MTJ Exp from front)
Sindurva-Dilkusha Outer - 70 Km: 45 Minutes (Halted Dilkusha for 30 Min, overtooked passenger in-between)
Dilkusha-Lko - 10 Km: 45 Minutes (Halted LKO Outer for 25 Min)
Result: Missed Duranto (filed TDR) & Travelled Shramjeevi (Following PNBE-MTJ Exp) with unreserved ticket, charged & receipt issued later on (3A/2A/1A was totally empty in Shramjeevi - No-one boarded @ LKO coz of late running)
PS: I have travelled SLN-LKO Stretch in 1 hr 45 min by Shramjeevi once!!

Translate to English
Translate to Hindi

686 views
0
Sep 08 2010 (22:30)
guest   0 blog posts
Re# 67260-6              
Dear Mr. Vinay , please don't get angry . Forget MZP-LKO Corridor . But aren't the other 2 superfast corridors connecting Gomoh - Patna Saheb & Dankuni - Panagarh possible ?? After all , many "Normal Superfast" & "Duronto" Trains can use these new lines to travel congestion free from Calcutta to North India (Punjab , UP , Uttrakhand and J & K) . Gussa mat kareye . Sir , agar aap aise naraz ho jayenge toh phir hamari queries known solve karega . Thank you .
Translate to English
Translate to Hindi

667 views
0

Sep 09 2010 (13:24)
Vinay Kumar   23030 blog posts
Re# 67260-7              
Thats y MGS-BSB-SLN/PBH-LKO Corridor is been developed!!
Further, CNB-Farrukhabad-Shikohabad too is Trunk Route & in future, that can provide link for CNB-BE-MB-ASR Route (Via Kasganj)!!
LDH-MB-LKO-GKP/BSB-GHY, MGS-PNBE/GAYA-HWH etc, can deconjest existing Trunk Route & Golden Corridor need not to be forget about!!
PS: Criss Cross movement can shatter train's speed greatly!!
Kindly
...
more...
compare: Sampoorna Kranti & Shramjeevi Exp!!

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy