Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

बिहार संपर्क क्रांति : मिथिला पेंटिंग की सुंदरता और तेज रफ्तार - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 690019
Posted: Mar 10 2013 (13:04)

2 Responses
Last Response: Mar 10 2013 (16:04)
Info Update
2459 views
0

Mar 10 2013 (13:04)   12262/Howrah - Mumbai CSMT AC Duronto Express | HWH/WAP-4/22413
 
Pratik~
Pratik~   5604 blog posts
Entry# 690019            Tags   Past Edits
I have travelled in this train and wana share my experience.
Train name:- Mumbai Duronto Express.
Date:-25th Feb 2013.
Loco incharged:- Ex WAP-6, now WAP-4 of Howrah shed from Howrah to Igatpuri and WCAM3 of Kalyan shed for the rest.
Punctuality:-
...
more...
It was very poor in punctuality. It departed ontime but got delayed right after departure upto bilaspur. It was halted for about 1+ hr in Tata-Bilaspur section. The reason might be technical fault but in that period, this train was delayed similarly on its every running day. The reason could be the freight traffic, which is given more importance as, as soon as we left hwh, a freight had overtaken us.
Speed:- In HWH-Bilaspur section, the mps might be 115 kmph to 120 kmph but it hardly reached 115+kmph. After Nagpur, it have touched 120kmph upto BSL after which might be 110kmph. But overall speed was not as good as it is suppose to be for Rajdhani type train with such rajdhani lhb coaches. Infact, after entering mumbai surburb Kalyan, it ran continously with good i.e like duronto despite mumbai is crowded with local trains and the train got delayed in sections where it should make high avg speed runs.
Food:- Food given was good especially the one picked from Tata and that from Bilaspur was fine. Breakfast from Howrah as well as Bhusawal was good too.
Other Facts:-
It is undoubtly, the most important train of the route but may being as duronto as it doesnt serve intermediate zone, this train is delayed i.e not given clearance at a times as happened in my journey.
It is SER train with no ER halt, still a ER Engine hauls it as it is believed that mps of SER Engines is 115kmph only and as the coaches of this train are fit for 160kmph and the tracks mps varies enroute with max 120kmph in ngp-bsl section, a 115+ i.e 130-140kmph capable HWH WAP-4 of ER does its duty to haul the train at best i.e at 120kmph wherever possible.

Translate to English
Translate to Hindi

1787 views
0

Mar 10 2013 (16:02)
navkant~
navkant~   3346 blog posts
Re# 690019-1              
great
Translate to English
Translate to Hindi

1632 views
0

Mar 10 2013 (16:04)
Yash^~   10917 blog posts
Re# 690019-2              
Great Report
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy