Search Forum
Blog Entry# 702414
Posted: Mar 23 2013 (13:06)
9 Responses
Last Response: Mar 23 2013 (13:52)
9 Responses
Last Response: Mar 23 2013 (13:52)
Mar 23 2013 (13:06) 12909/Bandra Terminus - Hazrat Nizamuddin Garib Rath Express (PT)
VIKAS SINGH
VIKAS SINGH 12 blog posts5 Posts
Its already a 21 coacher... I dont think it is running with 6 additional coaches making a total of 27. Please confirm the source of info.
thanks
thanks
I dont think so, coz P4 , P5, P7 all have the capacity of hauling at the max 26 coaches at a speed of 110 KmPh, but the IR has limited the no of coaches to 24 max for all its engines and in no way can they haul a 27 coacher.
If it runs with 27 coach then it would require a banking engine
If it runs with 27 coach then it would require a banking engine