Search Forum
Blog Entry# 816654
Posted: Jul 29 2013 (07:05)
No Responses Yet
No Responses Yet
Jul 29 2013 (07:05) 12019/Howrah - Ranchi Shatabdi Express
Nashua NH USA
Nashua NH USA 950 blog postsAccelerating to 130 kmph after Barddhaman - Bokaro Shatabdi Footplate (Jan. 2000) : After going through Barddhaman at 60 kmph, we were switched onto the fast Up track. All OHE structures were now standard AC. Instead of four separate poles, a single structure enveloped the tracks with hanging masts serving the middle two lines. Around 7.43 am, we crossed a WDM2-headed 17-coach train on the Dn. slow line. And then we thundered through Khana Jn. I observed lines taking off towards Bolpur. We were now on a sustained 130 kmph. run!! [NOTE: At that time, the train ran till Bokaro Steel City]