An article was given by Mr. Bal Gobind Mishra on 16 May 2012 at 08:30 AM.
/news/user/255367
The Spanish firm’ Inabensa Bharat along with its joint venture (JV) partner has bagged a contract to design, supply, install, test and commission 140 km of railway line between the cities of Ghaziabad and Moradabad located in Indian Railways’ northern sector.
Detail :-
The...
more...
/news/user/255367
The Spanish firm’ Inabensa Bharat along with its joint venture (JV) partner has bagged a contract to design, supply, install, test and commission 140 km of railway line between the cities of Ghaziabad and Moradabad located in Indian Railways’ northern sector.
Detail :-
The...
more...
20 Posts
बी. एस. बी. - एल. के. ओ. - एम. बी. रूट को १० साल लगे लेकिन १० साल का काम नहीं था। दो या सवा दो, ज़यादा से ज़यादा तीन साल में पूरा किया जा सकता था। ऐसे ही एम. बी. - एच. पी. यू. - जी. जेड. बी. रूट एक साल में पूरा किया जा सकता है। १० महीने में इंस्टालेशन और २ महीने टेस्टिंग काफी हैं। नहीं तो १२ महीने में इंस्टालेशन और ४ महीने टेस्टिंग के लिए बहुत हैं।
बाबूगढ़ (बी.बी.ओ.) में पोल लगने का काम धीरे धीरे शुरू हो गया है। गाजियाबाद (जी.जेड.बी.) से मुरादाबाद (एम. बी.) के बीच पड़ने वाले हर स्टेशन जैसे कि हापुड़-गढ़मुक्तेश्वर-गजरौला-अमरोहा तक पहले पोल लगाये जायेंगे। फिर तार खीचे जायेंगे। धीरे-धीरे सब काम पूरा हो जायेगा। पर्याप्त मात्रा में पोल उपलब्ध अभी नहीं हुए हैं। अभी बहुत स्लो काम हो रहा है।
scheduled tym and real tym taken yaahi toh diff hai ?
especially for IR.
especially for IR.
व्हाटेवर, जो कल नहीं हुआ वो आज होगा। जो आज नहीं हुआ वो कल होगा और जो कल नहीं होगा वो आने वाले दिनों में होगा।