Search Forum
Blog Entry# 903336
Posted: Nov 11 2013 (19:10)
1 Responses
Last Response: Nov 12 2013 (06:20)
1 Responses
Last Response: Nov 12 2013 (06:20)
As of now frequency of this train cannot be increased due to rake sharing arrangement with Tata-yesvantpur Express.Passengers of both trains are desperately demanding frequency increase. I think ideal option is to change the timings then only railways will be pressured into increasing the frequency.
change of timings wont help. rather it will disturb the passengers. extra rake if possible should be the way to increase in frequency...