Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Brindavan Express - ರೈಲು ಹೆಸರು ಬೃಂದಾವನ್ ,ಇದು ಯಾವಾಗಲೂ Number 1 - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 928056
Posted: Dec 07 2013 (17:39)

16 Responses
Last Response: Dec 21 2013 (10:37)
Travel Question
4804 views
0

Dec 07 2013 (17:39)   12214/Delhi Sarai Rohilla - Yesvantpur AC Duronto Express
 
yash_singh1000
yash_singh1000   23 blog posts
Entry# 928056            Tags  
I have a Question, this duronto running with slow speed as compare to Chennai duronto why? For eg: Nzm to Jhansi it takes around 5hr 30 min while Chennai duronto takes 4hr 30min.
Translate to English
Translate to Hindi

11 Posts

1998 views
1

Dec 18 2013 (15:56)
anvitjoshi^~
anvitjoshi^~   2338 blog posts
Re# 928056-12              
Delhi - Chennai is Fully Electrified Double Line route while Delhi - Bangalore is not. Secunderabad - Bangalore is a 600 km long Single Line Diesel route (Which 22693/94 Rajdhani takes from SBC-KCG) and another is a 700 km long diesel route which is 50% doubled and 50% single (Which 22691/92 Rajdhani and 1213/14 Duronto takes). Loco Change at Secunderabad/Kacheguda takes almost 30 mins. Moreover, the Secundarabad - Bangalore route is pathetically over congested.
It is not possible to either reduce the journey time of existing trains or introduce a new a train that takes less than 30 hrs b/w Delhi and Bangalore unless Secunderabad - Bangalore line is doubled and electrified (which is not going to happen till
...
more...
2020). Electrification b/w Bangalore and Secunderabad is expected to complete by 2015 but there is no proposal to double GY-SBC line Yet. SC - GY is almost doubled except for a single stretch from Matmari - Mantralayam Road, which has just started.

Translate to English
Translate to Hindi

1513 views
0

Dec 18 2013 (16:35)
indian railways   7174 blog posts
Re# 928056-13               Past Edits
I think the MPS of BZA-MAS section is 120 km/h.
Translate to English
Translate to Hindi

1516 views
0

Dec 18 2013 (16:41)
Anonymous1218~
Anonymous1218~   22543 blog posts
Re# 928056-14               Past Edits
110 kph. for M/E and also Rajdhani/Duronto.
I have mentioned it above.
Its not yet upgraded to 120 yet.
Translate to English
Translate to Hindi

1724 views
0

Dec 18 2013 (16:55)
Vinay Kumar   23030 blog posts
Re# 928056-15               Past Edits
First of all, Both Duronto do have different terminal & DEE train has to negotiate via NDLS ENTRY/EXIT before making it to NZM!!
I dont think, DEE-YPR can make DEE-NZM in 11 Minutes, as been projected with uniform AVG Speed!!
DEE-NDLS: 30-35 Mins, NDLS NZM: 25-35 Mins
The total run, after nullifying NDLS congestion, comes as 55-70 Mins!!
Kindly
...
more...
deduct it from total 5 Hrs 30 Mins run of DEE-YPR Duronto n u gonna find it @ 4 Hrs 20-35 Mins!!
Further, i dont think it would be trailing Tamilnadu Exp till JHS/ET, as per AVG Speed Projection!!!!

Translate to English
Translate to Hindi

1840 views
0

Dec 21 2013 (10:37)
anvitjoshi^~
anvitjoshi^~   2338 blog posts
Re# 928056-16              
Yes sir, recently I was travelling in MAS RAJ and he hardly overspeeded @ 112 Kmph in one or two instances in the entire MAS-BZA stretch.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy