Full Site Search  
Sun Mar 26, 2017 20:34:31 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 934596  
Posted: Dec 14 2013 (15:38)

4 Responses
Last Response: Dec 15 2013 (00:06)
  
General Travel
0 Followers
634 views
Dec 14 2013 (15:38)   MYS/Mysuru Junction (Mysore) (6 PFs)
 

BengaluruRailu   515 blog posts   22 correct pred (63% accurate)
Entry# 934596            Tags   Past Edits
What is the current status of sbc mys doubling? And is it true that stations are being upgraded to accomodate 23 coach trains? And is the route also being electrified?

  
390 views
Dec 14 2013 (15:54)
Metre Gauge*^~   3856 blog posts   13419 correct pred (75% accurate)
Re# 934596-1            Tags   Past Edits
Doubling has been done in patches............ and electrification work is 90% done upto Settihalli. and as PFs are still under construction, its is not known whether they will be able to accomodate 23 coaches.

  
349 views
Dec 14 2013 (16:09)
Vinay Kumar~   15554 blog posts   361 correct pred (78% accurate)
Re# 934596-2            Tags   Past Edits

  
286 views
Dec 14 2013 (18:16)
BengaluruRailu   515 blog posts   22 correct pred (63% accurate)
Re# 934596-3            Tags   Past Edits
Nice. Good move. Very good especially if the mys nanjangud nilambur work also starts soon. Mysore will become busier junction than sbc then. Six pfs would be inadequate.

  
294 views
Dec 15 2013 (00:06)
BengaluruRailu   515 blog posts   22 correct pred (63% accurate)
Re# 934596-4            Tags   Past Edits
Heard that three mps of chamrajnagar, sultan batheri, and the area in tn near bandipur have written a letter to rm demanding there be an immediate survey of nanjangud nilambur line.
Scroll to Top
Scroll to Bottom


Go to Desktop site