Search Forum
Blog Entry# 957836
Posted: Jan 07 2014 (19:19)
6 Responses
Last Response: Jan 07 2014 (19:58)
6 Responses
Last Response: Jan 07 2014 (19:58)
why nr is running dis long route train. for 524 km it takes 21+ hours . instead of dis they should start a intercity exp bt sre n lko.
1 Posts
after Electrification this will be converted into MEMU.
For eg, there is a long MEMU running b/w DLI-CNB by various No's 64152(DLI-ALJN),64154(ALJN-TDL),64156(TDL-ETW),64158(ETW-CNB) departs DLI @ 09.00 reaches CNB 19.30
For eg, there is a long MEMU running b/w DLI-CNB by various No's 64152(DLI-ALJN),64154(ALJN-TDL),64156(TDL-ETW),64158(ETW-CNB) departs DLI @ 09.00 reaches CNB 19.30
ya but they can run small route trains like lucknow Bareilly passenger n moradabad saharanpur passenger . small route passenger trains r more sucessfull than long route trains. it also runs only with 24 km/ hour. speed . atleast it should with 30 km/hour speed
many exp train having 21-24 kmph avg speed.how can pass have >30 avg speed? they need to halt @ each & evry station & also have to waste time on overtakes by all other trains.
ya.. see the OT's : /train/xo/2224/336/340 :O overtaken by every train on this route