Kindly update the Atlas - mavali to nathdwara single line section as construction electrification
Newspaper cutting attached for reference.
@admin @moderator
Kindly update the Atlas - mavali to nathdwara single line section as construction electrification
Newspaper cutting attached for reference.
The construction for alternative DC line begins!
As per the news received ,
The 28km new line will go through Chandrapura - Telo - Gomoh rail flyover bypass - Matari and merge in the grand chord
The project was sanctioned in August 2023 and supposed to be completed by March 2027
As per the news received ,
The 28km new line will go through Chandrapura - Telo - Gomoh rail flyover bypass - Matari and merge in the grand chord
The project was sanctioned in August 2023 and supposed to be completed by March 2027
22 Public Posts - Mon Mar 04, 2024
14 Public Posts - Tue Mar 05, 2024
#moderator sir and atlas monitors
Please update the following in atlas
1) Chandrapura - Telo - Matari new line (under construction)
2) Chandrapura bypass line (under construction)
Please update the following in atlas
1) Chandrapura - Telo - Matari new line (under construction)
2) Chandrapura bypass line (under construction)
1 Public Posts - Sat Mar 16, 2024
Mar 15 (10:09) 03394/Gaya - Kiul Passenger Special (UnReserved) | NWD/Nawada (2 PFs)
Mr.Xnawada
Mr.Xnawada 22 blog posts#moderator remove "special" from name of all tagged passenger trains, as they all are now run with normal fare.
Mar 13 (11:54) 12261/Mumbai CSMT - Howrah AC Duronto Express | CSMT/Mumbai CSM Terminus (18 PFs)
hrid22~
hrid22~ 9563 blog posts3 Public Posts - Wed Mar 13, 2024
1 Public Posts - Thu Mar 14, 2024
Page# 7186 Blog Entries next>>