Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Kamayani Express - Late आना है काम तुम्हारा लेकिन मैं फिर भी हूँ तुम्हारा दीवाना - Aman

Search Forum
<<prev trip    next trip>>
Trip# 89738
TRIP HAS ENDED.
Blog  Time-Table

1 Posts

6848 views
1

Jun 20 2016 (17:05)
~   2177 blog posts
Re# 1901581-2              
Happy journey Sir.
Translate to English
Translate to Hindi

7109 views
0

Jun 21 2016 (08:05)
guest   707 blog posts
Re# 1901581-3               Past Edits
Sorry couldn't post in the train....no signal in my sim....
So the train started off at the right time from VSKP....It started off to a slow start up to Duvvada....But after that it was pretty fast up to samalkot....and then it went very slow till rajamundry.....reaching RJY almost 1 hour late....I thought it would make up till BZA....was pretty fast up to EE....then I took a nap....again getting up at Vijayawada....
Translate to English
Translate to Hindi

6735 views
0

Jun 21 2016 (08:11)
guest   707 blog posts
Re# 1901581-4               Past Edits
In Vijayawada a series of interesting events took place...our train arrived 30 min late on pf 6.....The 12763 TPTY SC Padmavati on Pf 10 Overtook our train....The 12616 Grand Trunk SF was on pf 7.....Then the 12622 Tamilnadu SF arrived on pf 5....then grand trunk departed.....Visakha Express arrived on pf 1 I think.....Then the 12764 Sc tpty padmavati SF arrived on pf 7....then tamilnadu departed from pf 5.....Our train halted for about 25 min after a WAP 7 was attached at the other end....
Translate to English
Translate to Hindi

6731 views
0

Jun 21 2016 (08:16)
guest   707 blog posts
Re# 1901581-5               Past Edits
The train started of pretty slow...And it started from BZA at 00:35 AM....was most probably trailing padmavati.....I was pretty sure that the train would get delayed as SC BZA can be covered in a min of 5 H 25 min with all these halts..so after Madhira our train was on rampage....I was shocked seeing that at all stations except for Madhira ....had a goods train looped up for this train's overtake....was awake till Mahbubabad.....The train made screeching halts at both stations and accelerated to max limit....Then I dozed off....I woke up when the train crossed Bhongir....Upto Charlapalli the train was going at MPS.....I was shocked to see a train running with those speeds continuously at the outskirts of Hyderabad.....then before SC the train came to a halt....but did not stop for long.....Finally it came on pf 1 about 24 minutes late... Padmavati was to arrive at 07:00 which means that overtake...
more...
happened at some place between

Translate to English
Translate to Hindi

6646 views
0

Jun 21 2016 (08:28)
guest   707 blog posts
Re# 1901581-6              
TRIP HAS ENDED.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy