04812/Coimbatore - Bhagat ki Kothi Special Fare Summer Special
LBG/Limbgaon
BGKT/WDG-4/12417
9482 views
3
Emds ruling Limbgaon Customary link NWR BGKT WDG 4 12417 in short hood front mode skipping LBG in MPS with NWR 04812 CBE- BGKT special fare Summer Special (via RU, KCG, PAU, BSL, ST, ADI) While SWR UBL WDG 4 Multi waiting on other line.For video - click hereLimbgaon (LBG), South Central Railway(SCR)
×
12485/Hazur Sahib Nanded - Shri Ganganagar SF Express (Via Abohar)
LBG/Limbgaon
MLY/WDP-4D/40314
12253 views
0
Customary link GY transfer SCR Moula Ali WDP 4D 40314 in mps skipping Limbgaon with NWR 12485/Hazur Sahib Nanded - Shri Ganganagar SF Express (Via Abohar). While Electrification works going in full swing. For video - click hereLimbgaon (LBG), South Central Railway(SCR)
×
12766/Amravati - Tirupati SF Express
LBG/Limbgaon
GY/WDG-4D/70680
11101 views
6
When Twin WDG 6G meets Single WDG 4DSCR Gooty WDG 4D 70680 arriving LBG mainline for an unscheduled halt with SCR 12766 AMI- TPTY Express while SCR GY WDG 6G multi with a long BOXN load Skipping in MPS for climbing the gradient after LBGLimbgaon (LBG) South Central Railway (SCR)
×
17661/Kacheguda - Nagarsol Express
LBG/Limbgaon
24901 views
5
Nanded Series - IAfter Waiting for a long 1 Hour, here comes the pairing service of my train, it's 17661 Kacheguda - Rotegaon (now till Nagarsol) lead by Gooty WDP4D #40202, crawling into Limbgaon through UP Mainline (Towards Nanded Line) and halted on the Mainline itself, passengers were getting down on tracks, this happened because there was block between Limbgaon and Wanegaon Halt for construction work of Underpass, so the usual down line (towards Purna) was closed, and train was put on UP line.In the second slide, check out the RSA of the train.DOC: 27/1/23. LBG.
×
17661/Kacheguda - Nagarsol Express
LBG/Limbgaon
24901 views
5
Nanded Series - IAfter Waiting for a long 1 Hour, here comes the pairing service of my train, it's 17661 Kacheguda - Rotegaon (now till Nagarsol) lead by Gooty WDP4D #40202, crawling into Limbgaon through UP Mainline (Towards Nanded Line) and halted on the Mainline itself, passengers were getting down on tracks, this happened because there was block between Limbgaon and Wanegaon Halt for construction work of Underpass, so the usual down line (towards Purna) was closed, and train was put on UP line.In the second slide, check out the RSA of the train.DOC: 27/1/23. LBG.
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.