Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Sapt Kranti Express: Ruling the tracks with EMD Power - Keshav Singh

Search Forum
Post PNR
TRAIN IS CANCELLED
Availability Calendar
Search MTM to TPTY
Return# 17401
PDF Download

17402/Machilipatanam-Tirupati Link Express (PT)
मचिलीपट्णम - तिरुपति लिंक एक्सप्रेस

MTM/Machilipatnam --> TPTY/Tirupati

Updated: by Reva18~
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    177 blog entries  <<prev  next>>
General Travel
4736 views
0

Jun 10 2016 (19:27)   17402/Machilipatanam-Tirupati Link Express (PT)
 
CoringaExpress~
CoringaExpress~   5180 blog posts
Entry# 1888956            Tags  
#admin, kinldy check and revise the CC of 17401/2/3/4 as they arent matching. NS slip has a 2nd AC coach where same is nit reflecting in 17401 amalgamated Rake. and even teh Sleeper coach numbers are differing
Translate to English
Translate to Hindi

3938 views
1

Jun 10 2016 (19:29)
sumanth~   7932 blog posts
Re# 1888956-1              
2A reservation suspended for NS-Tpt slip from July 1St
indirectly shinfting this 2A from NS to MTM slip,not much change
Translate to English
Translate to Hindi

3918 views
0

Jun 10 2016 (19:44)
CoringaExpress~
CoringaExpress~   5180 blog posts
Re# 1888956-2              
17403 - S 5-8 whereas 17404 S 5-9
17401 = 17402 S1-5
Translate to English
Translate to Hindi

3688 views
0

Jun 10 2016 (20:06)
sumanth~   7932 blog posts
Re# 1888956-3              
pattern it is not perfectly updated
Translate to English
Translate to Hindi
1 Followers
Travel Question
6887 views
0

Feb 25 2016 (14:46)   17402/Machilipatanam-Tirupati Link Express (PT) | TPTY/Tirupati (6 PFs)
 
aditya301189
aditya301189   6 blog posts
Entry# 1749204            Tags  
Why 17402 arrived 4hours late to tpty it travelled 10kms 4 hours what happened
Translate to English
Translate to Hindi

4 Posts

5193 views
0

Feb 25 2016 (15:00)
aditya301189   6 blog posts
Re# 1749204-5              
Kk let us wait
Translate to English
Translate to Hindi

5064 views
0

Feb 25 2016 (21:22)
aditya301189   6 blog posts
Re# 1749204-6              
Finally no body replied why it is late for four hours my intention is tell passengers why it is late
Translate to English
Translate to Hindi

5019 views
0

Feb 25 2016 (21:26)
rahulbanerjeee^~
rahulbanerjeee^~   3640 blog posts
Re# 1749204-7              
I think it's late reason of passing the trains!
Translate to English
Translate to Hindi

5150 views
0

Feb 25 2016 (21:57)
aditya301189   6 blog posts
Re# 1749204-8              
Sir it is only 10kms distance in middle no stations are there
Translate to English
Translate to Hindi

4883 views
0

Feb 25 2016 (22:30)
rahulbanerjeee^~
rahulbanerjeee^~   3640 blog posts
Re# 1749204-9              
Ooh us otherwise signal problems
Translate to English
Translate to Hindi
General Travel
7248 views
5

Dec 03 2015 (00:00)   17402/Machilipatanam-Tirupati Link Express (PT) | OGL/Ongole (3 PFs)
 
Anurag^~
Anurag^~   6883 blog posts
Entry# 1668877            Tags  
On board mtm tpty exp to tpty
Arrived with bza p4
Hwh mas mail looped at ogl and will be short terminated at gdr
Translate to English
Translate to Hindi

6125 views
2

Dec 03 2015 (01:27)
TheRailMail^~
TheRailMail^~   56723 blog posts
Re# 1668877-1              
HJ
Translate to English
Translate to Hindi

5775 views
1

Dec 03 2015 (09:26)
sumanth~   7932 blog posts
Re# 1668877-2              
Got info than TN short terminated at OGL
GT at NLR
Mail at GDR
Shm AC exp also at GDR
Translate to English
Translate to Hindi
1 Followers
General Travel
4474 views
1

Oct 12 2015 (01:15)   17401/Tirupati-Machilipatnam Link Express
 
vsaikrishna23~
vsaikrishna23~   2539 blog posts
Entry# 1614490            Tags  
For this train better cancel slip to ns and give these slip to manugur then good connection for badrachalam tpty and new train to ns tpty with rsa ns nsl exp only 1rake will be needed
Translate to English
Translate to Hindi
General Travel
4150 views
0

Oct 29 2015 (03:46)   17401/Tirupati-Machilipatnam Link Express | BZA/Vijayawada Junction (10 PFs)
 
vsaikrishna23~
vsaikrishna23~   2539 blog posts
Entry# 1631602            Tags  
After 2nd track layed in bza bvrt section surely this train will be sf ns mtm tpty link sf exp with same no like 22701-22704 will be good
Translate to English
Translate to Hindi

3670 views
0

Oct 29 2015 (04:57)
SCRGodavariExpress~
SCRGodavariExpress~   4107 blog posts
Re# 1631602-1              
Any info on the status of these works? I heard works are progressing faster between BVRT and GDV.
Translate to English
Translate to Hindi

3744 views
0

Oct 29 2015 (05:09)
vsaikrishna23~
vsaikrishna23~   2539 blog posts
Re# 1631602-2               Past Edits
Yes 30-
40% of leveling finished with 50-60% ground works
Translate to English
Translate to Hindi

3711 views
0

Oct 29 2015 (08:20)
SCRGodavariExpress~
SCRGodavariExpress~   4107 blog posts
Re# 1631602-3              
I hope atleast one section will be opened for traffic by end of 2016.. I know it is a wild guess.. but hopefully.
Translate to English
Translate to Hindi
Page#    177 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy