With extension to MRDW, a train connects AP, North and west TN to coastal Karnataka (Udupi, Kundapura, Murudeshwara).
Timings need revision. As of now, it reaches MAQ at 0930 and leaves at 2000. As per notification, it reaches MRDW at 1400 and leaves at 1520. MAQ MRDW / MRDW MAQ can be coolly covered in 3.5 hours. So, TT should bre revised as follows: Towards MRDW -- KGQ 0745 MAQ 0900/ 0915 MRDW 1245. Return MRDW 1600 MAQ arrival 1945.