Search Forum
Filters:
Yesterday (09:56) BYC/Ballari Cantt. Halt (Bellary) (2 PFs)
SteelCityRF^~
SteelCityRF^~ 27550 blog postsA freight train (BOXNS wagons) skipping #Ballari Cantonment Halt on #March17th2024
This freight train was hauled by Erode (EDE) WAG-7 Twins i.e., #27436 and #27906
Enjoy electric loco horn
...
more...
This freight train was hauled by Erode (EDE) WAG-7 Twins i.e., #27436 and #27906
Enjoy electric loco horn
...
more...
More Posts
Trip Started: Wed May 01 by DreamTrip22503^~
TRIP TO VIT (VELLORE) VIA CHENNAI CENTRAL........
Hoping for Current availability after charting from RLWL charting qouta NDLS.... Trip will depend on ....... Charting status ........ otherwise Trip wiill be shifted to some another Train .......
Date of Travel may very.....
( 1st MAY TO 5th MAY ) ...... in between date of travel.....
( 1st MAY TO 5th MAY ) ...... in between date of travel.....
Dec 17 2023 (21:32) 15025/Mau - Anand Vihar Terminal Express (Via Ayodhya Cantt) | SHG/Shahganj Junction (4 PFs)
arishabh1819~
arishabh1819~ 1048 blog postsमाननीय श्री रेल मंत्री अश्विनी वैष्णव जी से अनुरोध की शाहगंज जंक्शन की बाईपास लाइन बनाई जाए, जिससे ट्रेनों को शाहगंज जंक्शन पर लोको रिवर्सल न करना पड़े, जिससे काफी समय की बचत होगी। Khanja Halt से Bilwai तक एक बाईपास लाइन बन जाने से ट्रेनों को काफी राहत मिलेगी। शाहगंज जंक्शन पर ज्यादातर गाड़ियां मऊ/आज़मगढ़ से लखनऊ की तरफ जाती हैं, जिसके कारण शाहगंज में लोको रिवर्सल करना पड़ता है, चूंकि शाहगंज जंक्शन पर प्लेटफार्म की संख्या कम होने के कारण अन्य ट्रेनों को आउटर पर रोक दिया जाता है। जिसके कारण ट्रेन लेट भी हो जाती है।
अतः Khanja Halt से Bilwai तक एक बाईपास लाइन बनाने का कष्ट करें। आप लोगों की क्या राय हैं, जरूर बताएं।
...
more...
अतः Khanja Halt से Bilwai तक एक बाईपास लाइन बनाने का कष्ट करें। आप लोगों की क्या राय हैं, जरूर बताएं।
...
more...
7 Posts
एक बायपास पहले से ही प्रस्तावित है जिसका अंतिम स्थान सर्वेक्षण होने वाला है।
जी, कार्य समाप्त होने के बाद शाहगंज पर कुल 6 प्लेटफार्म(शायद एक और टर्मिनेटिंग प्लेटफार्म) हो जायेंगे
पुराना भवन तोड़कर वहां पर 2 प्लेटफार्म बनेंगे
पुराना भवन तोड़कर वहां पर 2 प्लेटफार्म बनेंगे
Galat nirnay!
Yahi karna tha to 2 terminating platforms kyu bana rahe hai?
Yahi karna tha to 2 terminating platforms kyu bana rahe hai?
Abhi survey hi chal raha hai uske baad banne me kitna tym jaayega pata nhi 5.7 km ka bypass hoga ye... Iske ban ne se reversal aur Kam se Kam aadha ghanta bachaya jaa sakta hai... Par iska nuksan ye hai ki shahganj ko fir train nhi milegi kaifiyaat aur mau anand vihar jaisi trains... Shahganj ka alternative tb shyd didarganj ko banayenge
Just a trivial thought came into my mind...
Which are the long distance trains which have or had RSA at the non-PM end?
The ones I remember
HWH CSMT HWH Gitanjali and PURI...
more...
Which are the long distance trains which have or had RSA at the non-PM end?
The ones I remember
HWH CSMT HWH Gitanjali and PURI...
more...
13 Posts
16595/96 SBC - KAWR Panchganga Express is having RSA with 01595/96 KAWR - MAO Special at KAWR end with PM at SBC.
22957/58 VRL - GNC Somnath Express has RSA with 19223/24 GNC - JAT Express at GNC end, and with 19225/26 JAT - BGKT Express at JAT end with PM at VRL.
22957/58 VRL - GNC Somnath Express has RSA with 19223/24 GNC - JAT Express at GNC end, and with 19225/26 JAT - BGKT Express at JAT end with PM at VRL.
18013/14 HWH-BKSC has RSA with 08695/96 BKSC-RNC pass and PM @SRC
Palamu express rsa with Patna rajgir PM at BARKAKANA 13347/13348
Patna singrauli Patna dhanbad intercity PM at DHANBAD 13349/13350
Patna singrauli Patna dhanbad intercity PM at DHANBAD 13349/13350