#Electrificationupdate of #Ballaricantt station
🔸Photos captured on #August27th2018
🔸Sub-station
⏺️Sub-station is being constructed on airport side of the station
⏺️Transformers and control room - pictures 1 & 2
🔸Foundations...
more...
🔸Photos captured on #August27th2018
🔸Sub-station
⏺️Sub-station is being constructed on airport side of the station
⏺️Transformers and control room - pictures 1 & 2
🔸Foundations...
more...
4 Public Posts - Thu Aug 30, 2018
1 Public Posts - Fri Aug 31, 2018
#Electrificationupdate of #Ballaricantt station - Part-2: Foundations for OHE portal / poles at Ballari Cantonment (BYC2)
🔸Photos captured on #August7th2018
⏺️Picture 1 shows 5 incoming lines of Ballari Cantonment
⏺️Out of these 5 lines, 2nd (up line) and 3rd lines (down line) are main lines. 1st, 4th and 5th lines are loop lines (Count all these lines from right to left)...
more...
🔸Photos captured on #August7th2018
⏺️Picture 1 shows 5 incoming lines of Ballari Cantonment
⏺️Out of these 5 lines, 2nd (up line) and 3rd lines (down line) are main lines. 1st, 4th and 5th lines are loop lines (Count all these lines from right to left)...
more...
4 Public Posts - Thu Aug 09, 2018
3 Public Posts - Fri Aug 10, 2018
3 Public Posts - Sat Aug 11, 2018
4 Public Posts - Mon Aug 13, 2018
2 Public Posts - Tue Aug 14, 2018
1 Public Posts - Wed Aug 15, 2018
1 Public Posts - Sun Aug 19, 2018
3 Public Posts - Wed Feb 06, 2019
1 Public Posts - Sun Jun 16, 2019
#Electrificationupdate of #Ballaricantt station - Part-1: Sub-station
🔸When enquired regarding completion of electrification, site engineer replied that Guntakal - Ballari - Toranagallu - Hosapete section and Toranagallu - Ranjitpura section will be electrified and commissioned by June 2019
🔸Photos captured on #August7th2018
⏺️Sub-station is being constructed at Ballari Cantonment (BYC2)
⏺️This...
more...
🔸When enquired regarding completion of electrification, site engineer replied that Guntakal - Ballari - Toranagallu - Hosapete section and Toranagallu - Ranjitpura section will be electrified and commissioned by June 2019
🔸Photos captured on #August7th2018
⏺️Sub-station is being constructed at Ballari Cantonment (BYC2)
⏺️This...
more...
8 Public Posts - Thu Aug 09, 2018
Oct 10 2016 (15:59) 06923X/Hubballi - Ballari Fast Passenger Special (UnReserved) | BYC2/Ballari Cantt. BG (Bellary) | GY/WDG-4/12569