#ELECTRIFICATIONUPDATE of TNGL-JSW loop line
The electric poles are now fitted with some socket.
Date: 6th Jan 2020
Pic: SELF
The electric poles are now fitted with some socket.
Date: 6th Jan 2020
Pic: SELF
2 Public Posts - Mon Jan 06, 2020
Dec 25 2019 (00:45) SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
SWRailway^~
SWRailway^~ 13434 blog postsPic 1-3 BYPL ramp connecting SA line got electrified. With this electrification of enitre 48 kms of BYPl HSRA section is completed and after HSRA till Rayakottai ohe poles are being laid and by end of 2020 upto DPJ works will be completed and according to some sources electrification works have been started from Omalur side also but no confirmation about that. Now BAW UBL and YNK KQZ are the last remaining important routes which must be electrified.
Pic 4,5,6 and 7 Shots in YNK DMM section which was recently upgraded to 115 kmph mps. Some curves was made more inclined and sleepers were replaced with heavier ones along with that 60 kg rails were placed to fit higher speeds and main...
more...
Pic 4,5,6 and 7 Shots in YNK DMM section which was recently upgraded to 115 kmph mps. Some curves was made more inclined and sleepers were replaced with heavier ones along with that 60 kg rails were placed to fit higher speeds and main...
more...
4 Public Posts - Wed Dec 25, 2019
4 Public Posts - Wed Dec 25, 2019
#ElectrificationUpdate #16December2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 100%
Wiring - 100%
OHE...
more...
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 100%
Wiring - 100%
OHE...
more...
1 Public Posts - Mon Dec 16, 2019
1 Public Posts - Sun Dec 22, 2019
3 Public Posts - Mon Dec 23, 2019
2 Public Posts - Tue Dec 24, 2019
2 Public Posts - Thu Jan 02, 2020
2 Public Posts - Sun Jan 12, 2020
1 Public Posts - Mon Jan 13, 2020
#ElectrificationUpdate #09December2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 100%
Wiring - 99%
OHE...
more...
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 100%
Wiring - 99%
OHE...
more...