Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Shan-e-Bhopal - तेरी खूबसूरती से नजर नही हटती, नजारे हम क्या देखें - ललितपुरी रेलफैन

Search Forum
Filters:
Page#    676889 Blog Entries  <<prev  next>>
General Travel
12943 views
2

May 19 (06:57)   12130/Azad Hind Express (PT)
Rail12345
Rail12345   2292 blog posts
Entry# 6069060            Tags   Past Edits
PM for this train should be transferred immediately to SER and SER should immediately provide LHB Coaches and make RSA with any other SER train to reduce delays. Condition of ICF coaches is very bad and looking at the huge delays everyday, maintainance at Pune end is not upto the mark. Accident can happen anyday. This train is running with huge risk. RB should immediately think about it.
CR is totally neglecting this important train don't know why
Translate to English
Translate to Hindi

7410 views
2

May 20 (14:12)
Exynos9611~   13822 blog posts
Re# 6069060-1              
30hrs late new record
Translate to English
Translate to Hindi

6961 views
0

May 20 (14:33)
AZT~
AZT~   3208 blog posts
Re# 6069060-2              
Kids.
There are legendary trains running with delays upto 100h.
Translate to English
Translate to Hindi

7221 views
2

May 20 (14:33)
deepak.yerr~
deepak.yerr~   6200 blog posts
Re# 6069060-3              
1 compliments
Agree
The main issue is delay which I's effecting its cleanliness and maintainance. Even if transferred to SER the situation will not improve and regarding RSA it has 12+ hrs turnaround time at both ends and is still not able to recover delay. If any other trains has RSA the punctuality of that train will be at stake which is not at all recommended. It us better to leave Tata Raipur section passing trains to them selves. The best adhoc solution is to provide extra rake at base station for every daily train.
Translate to English
Translate to Hindi

6194 views
0

May 20 (16:36)
Exynos9611~   13822 blog posts
Re# 6069060-4              
ser and secr has some issues with 12129/30
Translate to English
Translate to Hindi

5423 views
1

May 20 (16:54)
KKRAlwaysDestroyTeamIndia~
KKRAlwaysDestroyTeamIndia~   1536 blog posts
Re# 6069060-5              
49 hrs late biggest record. 30 hrs is bachha infront of that
Translate to English
Translate to Hindi
General Travel
6128 views
2

May 19 (16:23)   NCN/Nachinda P.H. (1 PFs)
Rail12345
Rail12345   2292 blog posts
Entry# 6069600            Tags  
Mechada-Digha Local today collided with sand loaded truck. Front end of the train got damaged after collision
Translate to English
Translate to Hindi

4371 views
0

May 19 (16:27)
WAP7NFRMLDT~
WAP7NFRMLDT~   781 blog posts
Re# 6069600-1              
Didn't SER remove any level crossings??😠😤
Translate to English
Translate to Hindi

5045 views
1

May 19 (16:40)
Rail12345
Rail12345   2292 blog posts
Re# 6069600-2              
Pics of today's accident train. Photo credit to owner
Translate to English
Translate to Hindi
General Travel
9085 views
15

★★
Yesterday (11:32)   HWH/Howrah Junction (23 PFs)
Vijayawada
Vijayawada   25 blog posts
Entry# 6074489            Tags  
6 compliments
Useful:info. Useful Useful Great Great Useful
Pitlines in various Coaching Depots in Eastern Railway Railway Zone:

1. Tikiapara Coaching Depot (Howrah) - 14 Pitlines
• Pitline-1 580m 26 ICF/23 LHB
• Pitline-2 580m 26 ICF/23 LHB
...
more...
Pitline-3 550m 24 ICF/22 LHB
• Pitline-4 550m 24 ICF/22 LHB
• Pitline-5 523m 23 ICF/21 LHB
• Pitline-6 467m 21 ICF/18 LHB
• Pitline-7 415m 18 ICF/16 LHB
• Pitline-8 360m 16 ICF/14 LHB
• Pitline-9 385m 17 ICF/15 LHB
• Pitline-10 410m 18 ICF/16 LHB
• Pitline-11 360m 16 ICF/14 LHB
• Pitline-12 460m 20 ICF/18 LHB
• Pitline-13 520m 23 ICF/21 LHB
• Pitline-14 550m 24 ICF/22 LHB

2. Liluah Coaching Depot (Howrah) - 6 Pitlines
• Pitline-1 550m 24 ICF/22 LHB
• Pitline-2 550m 24 ICF/22 LHB
• Pitline-3 550m 24 ICF/22 LHB
• Pitline-4 550m 24 ICF/22 LHB
• Pitline-5 550m 24 ICF/22 LHB
• Pitline-6 576m 25 ICF/23 LHB

3. Jheel Siding Coaching Depot (Howrah) - 3 Pitlines
• Pitline-1 311m 13 ICF/11 LHB
• Pitline-2 600m 26 ICF/24 LHB
• Pitline-3 600m 26 ICF/24 LHB

4. Barddhaman - 2 Pitlines
• Pitline-1 8 ICF
• Pitline-2 8 ICF

5. Azimganj - 2 Pitlines
• Pitline-1 9 ICF
• Pitline-1 9 ICF

6. Sealdah Coaching Depot - 8 Pitlines
• Pitline-1 502m 22 ICF/21 LHB
• Pitline-2 502m 22 ICF/21 LHB
• Pitline-3 535m 24 ICF/22 LHB
• Pitline-4 535m 24 ICF/22 LHB
• Pitline-5 535m 24 ICF/22 LHB
• Pitline-6 506m 22 ICF/21 LHB
• Pitline-7 517m 23 ICF/21 LHB
• Pitline-8 418m 18 ICF/16 LHB

7. Kolkata Coaching Depot - 4 Pitlines
• Pitline-1 535m 24 ICF/22 LHB
• Pitline-2 535m 24 ICF/22 LHB
• Pitline-3 467m 21 ICF/19 LHB
• Pitline-4 288m 13 ICF/12 LHB (Under Construction)

8. Asansol Coaching Depot - 4 Pitlines
• Pitline-1 564m 24 ICF/22 LHB
• Pitline-2 460m 20 ICF/18 LHB
• Pitline-3 560m 24 ICF/22 LHB
• Pitline-4 560m 24 ICF/22 LHB

9. Madhupur - 1 Pitline
• Pitline-1 24 ICF/22 LHB (Under Construction)

10. Deoghar - 1 Pitline
• Pitline-1 14 ICF/12 LHB (Under Construction)

11. Malda Town Coaching Depot - 3 Pitlines
• Pitline-1 550m 24 ICF/22 LHB
• Pitline-2 550m 24 ICF/22 LHB
• Pitline-3 550m 24 ICF/22 LHB

12. Bhagalpur Coaching Depot - 4 Pitlines
• Pitline-1 550m 24 ICF/22 LHB
• Pitline-2 550m 24 ICF/22 LHB
• Pitline-3 460m 20 ICF/18 LHB
• Pitline-4 550m 24 ICF/22 LHB (Under Construction)

13. Jamalpur Coaching Depot - 1 Pitline
• Pitline-1 17 Coaches

14. Sahibganj - 1 Pit line
• Pitline-1 14 Coaches

15. Godda Coaching Depot - 1 Pitline
• Pitline-1 580m 24 ICF/22 LHB (Under construction)

Translate to English
Translate to Hindi
0
updating ...
3 wishes
Happy Journey ଶୁଭ ଯାତ୍ରା Happy Journey
short outing to native place for 2 days...

61 Posts

FmtBlog
1836 views
0

Today (06:00)
Rai_abhi^~
Rai_abhi^~   28598 blog posts
Re# 6074693-62            Tags  
1 km from @BQW: Barakalan Halt   105km/h   19m late
@BQW: Barakalan Halt &100 km/h 100 kph
Translate to English
Translate to Hindi

FmtBlog
1828 views
0

Today (06:03)
Rai_abhi^~
Rai_abhi^~   28598 blog posts
Re# 6074693-63            Tags  
Gahmar  
@BQW: Barakalan Halt 2 km <--> 1 km @GMR: Gahmar   48km/h   20m late
@GMR: Gahmar &50 km/h arriving shortly
Translate to English
Translate to Hindi

FmtBlog
2040 views
0

Today (06:05)
Rai_abhi^~
Rai_abhi^~   28598 blog posts
Re# 6074693-64            Tags  
Gahmar  
@GMR: Gahmar   0km/h   20m late
@GMR: Gahmar &33 km/h Arrived finally
Translate to English
Translate to Hindi

FmtBlog
1998 views
1

Today (06:06)
Rai_abhi^~
Rai_abhi^~   28598 blog posts
Re# 6074693-65            Tags  

2 pics

@GMR: Gahmar   3km/h   20m late
@GMR: Gahmar &0 km/h #13005: Howrah - Amritsar Mail arrived
Translate to English
Translate to Hindi

1238 views
0

Today (06:35)
sairam.shekhar~
sairam.shekhar~   448 blog posts
Re# 6074693-66              
Display board wrong
Translate to English
Translate to Hindi
TT Yet to he updated at FMT, It's Thiruvarur Trichy passenger. Boarding now for first diesel ride

7 Posts

FmtBlog
1975 views
0

Today (05:35)
K.V.A.~
K.V.A.~   14835 blog posts
Re# 6075090-8            Tags  
10 km from @TJ: Thanjavur Jn   27km/h   10m early
@TJ: Thanjavur Jn &27 km/h accelerating
Translate to English
Translate to Hindi

FmtBlog
1953 views
0

Today (05:38)
K.V.A.~
K.V.A.~   14835 blog posts
Re# 6075090-9            Tags  
5 km from @TJ: Thanjavur Jn   109km/h   7m early
@TJ: Thanjavur Jn &109 km/h skipped abandoned mariamman kovil at mps
Translate to English
Translate to Hindi

FmtBlog
1883 views
0

Today (05:43)
K.V.A.~
K.V.A.~   14835 blog posts
Re# 6075090-10            Tags  
@TJ: Thanjavur Jn   10km/h   2m early
@TJ: Thanjavur Jn &13 km/h at outers
Translate to English
Translate to Hindi

FmtBlog
1817 views
0

Today (05:46)
K.V.A.~
K.V.A.~   14835 blog posts
Re# 6075090-11            Tags  
@TJ: Thanjavur Jn   12km/h   1m late
@TJ: Thanjavur Jn &12 km/h Arrived at PF5
Translate to English
Translate to Hindi

FmtBlog
1950 views
1

Today (05:51)
K.V.A.~
K.V.A.~   14835 blog posts
Re# 6075090-12            Tags  

2 pics

@TJ: Thanjavur Jn   2km/h   6m late
@TJ: Thanjavur Jn &2 km/h
Translate to English
Translate to Hindi
Page#    676889 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy