Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Forum
Filters:
Page#    127 Blog Entries  <<prev  next>>
Info Update
8272 views
10

Nov 25 2019 (16:15)   STP/Sitapur Junction (6 PFs)
shuk^~
shuk^~   4243 blog posts
Entry# 4496931            Tags   Past Edits
#ElectrificationUpdate #25November2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 99% done (Completion expected by 27-Nov-2019)
Wiring - Currently wiring happening at STP/Sitapur station leaving one patch where BUW-STP-ROZA section
...
more...
existing line crosses DAL-STP line another patch at DAL yet to get connected in existing line. Rest all is done.
OHE van : Started from DAL end and completed till KMP/Kamlapur.
SSP - 2 SSP's been located at SD and STP. At STP basic structure completed and two fuses has been placed (Completion expected by Dec2019 or so). At SD nothing much progressed.
SP - Basic structure completed and two transformer has been placed at BKT SP (Completion expected by Dec2019 or so).
Block - 4 hours block been requested at DAL and STP respectively for connecting with existing live wire. More info awaits.
OHE wire energized - Expected by Dec2019
Trial run : First trial run expected on 29-Nov-2019 which depends on following :
1. Wiring completion at STP
2. OHE finalize work till STP
3. Block completed for connecting new line with existing live wire
else it would be in month of Dec2019.
CRS inspection - As per newspaper 25-Dec-2019
Commercial uses - Any point of time after successful CRS and permission granted by traffic department.
** All completion dates are tentative**

Translate to English
Translate to Hindi

5 Public Posts - Mon Nov 25, 2019

1 Public Posts - Tue Nov 26, 2019
Info Update
9675 views
7

Nov 18 2019 (19:38)   STP/Sitapur Junction (6 PFs)
shuk^~
shuk^~   4243 blog posts
Entry# 4491807            Tags  
#ElectrificationUpdate #18November2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 96% done (Completion expected by 23-Nov-2019)
Wiring - Initiated on 31-Aug-2019 at MBP/Mohibullapur. From DAL/DaliGanj Junction wiring started leaving one
...
more...
patch for final linking with existing live wire. As per latest update wiring reached till KB station (Just 6Km from STP) moreover OHE van has already started from DAL end and completed till AA/Ataria (Wiring completion expected by 23-Nov-2019 or so).
SSP - 3 SSP's been located at BKT, SD and STP. Two transformer has been placed at BKT SSP and work in progress at STP rest nothing much has progressed (Completion expected by Dec2019 or so)
Block - 4 hours block been requested at DAL and STP respectively on 22-Nov till 24-Nov for connecting with existing live wire. More info awaits.
OHE wire energized - Expected by Dec2019
Trial run : First trial run would be on 29-Nov-2019
CRS inspection - Expected by Dec2019
Commercial uses - Any point of time after successful CRS
** All completion dates are tentative**

Translate to English
Translate to Hindi

2 Public Posts - Fri Nov 22, 2019

2 Public Posts - Sat Nov 23, 2019
Info Update
7548 views
6

Nov 08 2019 (17:59)   STP/Sitapur Junction (6 PFs)
shuk^~
shuk^~   4243 blog posts
Entry# 4482062            Tags  
#ElectrificationUpdate #08November2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 93% done (Completion expected by 16-Nov-2019)
Wiring - Initiated on 31-Aug-2019 at MBP/Mohibullapur. From DAL/DaliGanj Junction wiring started leaving one
...
more...
patch for final linking with existing live wire. As per latest update wiring reached till KB station (Wiring at IJ station only will begin from 09-Nov-2019) moreover OHE van has already started from DAL end and completed till BKT outer (Wiring completion expected by 23-Nov-2019 or so).
SSP - 3 SSP's been located at BKT, SD and STP. Two transformer has been placed at BKT SSP rest nothing much has progressed (Completion expected by Dec2019 or so)
Block - 4 hours block been requested at DAL and STP respectively for connecting with existing live wire. More info awaits.
OHE wire energized - Expected by end of Nov2019 or starting of Dec2019
Trial run : First trial run would be on 29-Nov-2019
CRS inspection - Expected by Dec2019
Commercial uses - Any point of time after successful CRS
** All completion dates are tentative**

Translate to English
Translate to Hindi

3 Public Posts - Fri Nov 08, 2019
Rail Fanning
36023 views
22

★★★
Nov 06 2019 (14:36)   RDG/Rayadurg Junction (2 PFs)
SteelCityRF^~
SteelCityRF^~   27696 blog posts
Entry# 4480020            Tags   Past Edits
#Electrificationupdate of Rayadurgam - Molkalmuru section as on November 6th 2019 i.e., Today
🔹Aligned OHE poles (without insulators) were spotted in between Rayadurgam and Molkalmuru
Pictures source: Self
Translate to English
Translate to Hindi

1 Public Posts - Wed Nov 06, 2019
Rail Fanning
20408 views
13

★★
Oct 31 2019 (20:24)   16546/Sindhanur - Yesvantpur Express | BAY/Ballari Junction (Bellary) (4 PFs) | KJM/WDP-4D/40525
SteelCityRF^~
SteelCityRF^~   27696 blog posts
Entry# 4474338            Tags   Past Edits
Railfanning near Ballari Junction on #October31st2019 i.e., today
🔸Spotting
1) & 2) 56910 - Hosapete - KSR Bengaluru Passenger was spotted with KJM/WDP-4D/40525. This train arrived 17 minutes #before scheduled arrival time on platform no.1 of Ballari Junction - #WDP4DKJM
🔸 #Electrificationupdate of Ballari bypass line
3)
...
more...
Wiring stopped from Hosapete side
4) Aligned OHE poles were spotted towards Chikjajur side
Pictures source: Self

Translate to English
Translate to Hindi

1 Public Posts - Fri Nov 01, 2019

1 Public Posts - Sat Nov 02, 2019
Page#    127 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy