any latest pics or news regarding ET-ALD electrification work??????????
6 Posts
i hope so till now No Hope . because My Father Was Told Me any Sub station power plant will be setup in Jaitwara Station So Sub station Work is Going on . But OHE Poles is Still Pending
---
Yes Wait Upto 2017 or 18
---
Yes Wait Upto 2017 or 18
:(((( ok so minimum 2yrs will take ohe wires to reach jbp so sad
once the ET-ALD route via jbp will be electrified halt timing of many trains going towards ET-JBP-KTE-ALD will be reduced because no engine change is needed and trains coming from mumbai can go further to jbp-kte-ald with a single electric loco and electrification will save much time so hope to c the work will complete asap
CORE should complete ET-ALD section electrification ASAP so that LOCO change problems and time wasting in terms of long halting time of loco changing stations of many trains should be solved
if the ET-ALD electrification work will b completed soon then trains from cst to ald will get one stretch of electrified route and travel time will become less also so lets c wen CORE will complete this important section electrification work