Search Forum
Blog Entry# 1453995
Posted: May 04 2015 (11:42)
15 Responses
Last Response: May 05 2015 (16:12)
15 Responses
Last Response: May 05 2015 (16:12)
Other News
NER/North Eastern
![](http://st.indiarailinfo.com/images/1.png)
Ravana~ 27 news posts
बलरामपुर : बड़ी लाइन की ट्रेन चलने की प्रतीक्षा कर रहे लोगों का रविवार को तब राहत महसूस हुआ, जब कोच लेकर एक इंजन तुलसीपुर स्टेशन...
read more... स्टेशन पर आए इंजन को देखने दौड़े लोग
8 Public Posts - Mon May 04, 2015
Tamping machine packs the track ballast under the railway track to make the tracks more durable it also corrects the alignment of tracks to make them parallel
The the work of DGS dynamic track stabilizer is to provide the track its resistance back by stabilizing it. It simulates the passage of train by its vibrating unit which holds the track and applies horizontal vibration and vertical load. Vertical pressure applied- 100kg/cm²
Vibration frequency- 30-35Hz
The the work of DGS dynamic track stabilizer is to provide the track its resistance back by stabilizing it. It simulates the passage of train by its vibrating unit which holds the track and applies horizontal vibration and vertical load. Vertical pressure applied- 100kg/cm²
Vibration frequency- 30-35Hz
5 Public Posts - Mon May 04, 2015
1 Public Posts - Tue May 05, 2015