Lets wait for 1 year than waiting for 10 years. Any ways if CBN wants this metro pillars also wont complete by 2019 better not challenge CM of state.
well sridharan knows well enough more than us so, lets welcome proposed coridor, if works start like installing pillars then we can have a relief that metro works are on track..need not criticize each and evry thing..
GWK can be connected to metro corridor up to NAD using existing railwaylines on the lines of MMTS and local EMUS towards gwk side until metro phase 2 takes place