Search Forum
Blog Entry# 1557761
Posted: Aug 04 2015 (19:48)
98 Responses
Last Response: Aug 08 2015 (21:45)
98 Responses
Last Response: Aug 08 2015 (21:45)
Aug 04 2015 (19:48) 12554/Vaishali SF Express (PT) | GD/Gonda Junction (5 PFs)
TheRailMail^~
TheRailMail^~ 56724 blog postsIts been two years long Maintenance, A down life demanding for its original speed, Trains demanding speed up but A slow working and avoiding nature created a very bad situation in North Eastern Railways "Hottest" Line.
Train mostly come +0 at BBK(NR) and get trolled till they got delayed by +1hr at GD. The BBK-GD down track seriously need a look. No one knows what type of upgradation work going on. A 30km section was not able to take breathe normally. Feel so much Pity on North Eastern Railway for this.
Again...
more...
Train mostly come +0 at BBK(NR) and get trolled till they got delayed by +1hr at GD. The BBK-GD down track seriously need a look. No one knows what type of upgradation work going on. A 30km section was not able to take breathe normally. Feel so much Pity on North Eastern Railway for this.
Again...
more...
65 Public Posts - Tue Aug 04, 2015
3 Public Posts - Wed Aug 05, 2015
Ye sab natak hain inke...electrification complete hone ke baad bhi electric locomotives se trains abhi nahi chalengi aur na hi koi memu/emu chalegi ..electrification complete hone ke baad kahenge hamare paas e locos ki shortage hai phir kahenge hamare paas ELS nahi hai phir kahenge loco link ki problem aa rahi hai phir kahenge eloco chalane ke liye loco pilots nahi hain..aisa karte karte do char saal to laga hi denge ...
5 Public Posts - Wed Aug 05, 2015
7 Public Posts - Thu Aug 06, 2015
10 Public Posts - Fri Aug 07, 2015
7 Public Posts - Sat Aug 08, 2015