Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans never grow old

Search Forum
<<prev entry    next entry>>
Blog Entry# 1589668
Posted: Sep 13 2015 (22:17)

177 Responses
Last Response: Oct 31 2015 (00:20)
5 Followers
General Travel
39483 views
54

★★★
Sep 13 2015 (22:17)   ALD/Allahabad (10 PFs)
 
TheRailMail^~
TheRailMail^~   56723 blog posts
Entry# 1589668            Tags  
After Several months and weeks understanding deeply the ALD outer concept Here is one post dedicated to the Allahabad jn. controlling IMO.
For it I recall some of my rides, some controlling videos, talks with Officials to understand and learn the Ald jn.
Improvement with EDFC and its Connection with GMC and third line of ALD-MGS, how it gonna help.... all in one post..!!
.
...
more...

1) ALD jn. is a jn where trains coming from 6 sides. CNB, JBP,MGS,BSB,SLN,BSB(viaJanghai) in which via cnb and mgs maximum number of trains and freight operated. It has total 10 pfs. ALD is a NCR division mainstream of IR and play very important role for IR and this is why has been awarded many times for best management.
.
2)Platform arrival: There are several trains which originate from ALD jn and they got either 8 or 1 no of pf to start with. Most of the trains coming BSB-SLN sides are ontime trains and they got first preference to ALD (as per officials), Also they dont have to disturb mainline trains/freights much so they easily brought up to the pf while others have to wait either for late running or because of freight occupying the pf. The train coming from CNB side arrived after 3rd no of pf and depart subsequently. Trains coming towards Naini-Prayag side are have to wait more and if they have arrival after 3rd no. of pf they have to wait more because of crossing of main lines and other zig-zag motions. They got detained and delayed in dep too because they have to come on main line just like they came on the pfs. so entry and exit both are having prob.
.
3) Congestion: Till 2005/7 this jn was handling trains superbly managing the time and speed but
In recent time (5yrs) it has gone through with very bad phase or we can say IR political play made it worst. How?
in the last 10 to 15 year IR got 2 RM from Bihar and 1 major from West bengal and in every budget they have introduced numbers of trains passing through this which has result in congestion. The new govt is very much understanding this fact and also stated that appox 200% of load carrying under this jn.
there are no by pass available for this jn. and here one fact is notable that its every outer is a Jn. point except 2 which has the scene more worst and the term CONGESTION became as big that train got a delay of minimum 2hrs just passing through this jn.
.
4) Priority: This is one of important thing which should be considerable for ALD jn. Here the top priority given to Rajdhani class train and there after freights and then SF-Exp-Pass..!
While Rajdhani class has the topmost priority then SF category should have the 2nd position as no shatbdi runs from/via ALD but as per RB guidelines freights towing coals having 2nd most priority because it help us to generate energy and if there are delay then it may end with bad night or work for us.
(MGS) Many freights you can see which are booked either for Dadri or gmc back to back on ALD outers even on the PFs of ALD to go on and here they work /blog/post/1495769 on hand signals because if they will follow the home signal then it will be more time consuming and same applied for other passenger trains.
One of the funny occurrence you can see near by ald that your train is sidelined and a Freight otied you this is just because of above given fact.
but time to time we see diff in this as RB give preference order and freights got the last number of priority and passenger trains enjoy there run just like they did in the last decade. Here time to time reduction in freight train happens also which signifies in normal run of pass trains.
.
5) EDFC-3rd Line: By the time of 2007 it was good for trains to have a good time to ald station and roll out from it but after this year the politics ruins the enjoyment of passengers and this went upto next 5 yrs and still in progress but at the last some infrastructure comes up in development (On going) which will help up this jn to regain its old status for trains. EDFC will by-pass the line hand will have flyover type passing with ALD outer and this will help reducing hundreds of freights entering and holding the passenger trains for hours. also this line will be directly connected to GMC and Dadri so much faster connectivity for frieght it will give.
3rd line of MGS-ALD will help to reduce the load of passenger trains on this jn and there will be no more demand for intersection points.
#
Have a look at first version of this spotting: /blog/post/1495769
I hope my post will help some gentlemen's doubt clear and it will help in reduction in bashing post.
There are more and many things I have to write but time is a contraint, if anyone have any question he can pvt me or just comment to this reply.
Thanks

Translate to English
Translate to Hindi

207 Posts

2932 views
0

Oct 30 2015 (09:44)
Arnab_K~
Arnab_K~   9138 blog posts
Re# 1589668-208              
You are spot on....the entire Bhojudih-Bhaga-Mahuda-Khanudih-Gomoh is plagued by terrain constraints, and there is a PSR in place....and it is difficult to find another alternative, However IR can do one thing.....they can take the Adra-Burnpur-Barchak line and directly join the main/chord line at Sitarampur.
The trains coming from BBS can then directly access the main line as well!
Translate to English
Translate to Hindi

2703 views
2

Oct 30 2015 (10:26)
Arnab_K~
Arnab_K~   9138 blog posts
Re# 1589668-209              
Rnc Garib Rath getting higher priority than Rnc Rajdhani......Joke of the Day :P .
Translate to English
Translate to Hindi

2490 views
0

Oct 30 2015 (12:46)
Ankit^~   16706 blog posts
Re# 1589668-210              
Kis basis pe Rajdhanis ka seniority-juniority kar rahe ho?
Aur RR kabse lowest priority Raj ban gayi.?
Translate to English
Translate to Hindi

2747 views
0

Oct 30 2015 (18:25)
adi.dhn~
adi.dhn~   6007 blog posts
Re# 1589668-211               Past Edits
barachak - adra line also has lots of PSR. trains take almost 50-55 minutes to cover 37km distance. which is same as DHN-CRP time.
better IR should connect Rakhitpur with Rukni.
it will helpful for DHN-KGP Via Adra & DHN-TATA Via Rukni_Anara loop.
Translate to English
Translate to Hindi

3365 views
0

Oct 31 2015 (00:20)
guest   4536 blog posts
Re# 1589668-212              
No joke bro, when people can compare et with ald and then bash ald outscoring then there's no harm comparing rnc gr with rnc raj :D
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy