Search Forum
Blog Entry# 1656274
Posted: Nov 21 2015 (04:51)
1 Responses
Last Response: Nov 21 2015 (05:32)
1 Responses
Last Response: Nov 21 2015 (05:32)
Nov 21 2015 (04:51) 12788/Nagarsol - Narasapur Superfast Express (Via Warangal)
vsaikrishna23~
vsaikrishna23~ 2539 blog postsScr spoiled this train its very sad nsl-kmt 53km/h and from kmt-ns 30km/h even after doubling between bvrt bza section should retain its old shedule even though its having huge slack between kmt-bza 100km in 3h and 17256/17403 take 3.20min frm bza-ns but its is given 4.20min even its arr pko is 30-40min early but still it will wait for give crossing for its pairing trains 17213/17231 in pko y this train not allowed to arrive before dep of 17213/17231 at ns
Why daily required at all instead ns could have one weekly to mas,tvc easily with same rake if nsl is biweellly