Search Forum
Blog Entry# 1716586
Posted: Jan 20 2016 (21:16)
8 Responses
Last Response: Jan 21 2016 (13:43)
8 Responses
Last Response: Jan 21 2016 (13:43)
This train runs under unelectrified region only for 250 km out of its 1445 km journey... The railways wants to save money and wastes so much diesel.
3 Posts
Availability of electric loco that too passenger loco is a problem. But this train gives one of the best experiences to a railfan. I would like this train to continue like this until G-BPQ isn`t electrified. The twins make it more memorable.
I saw board describing details of electrification of g-bpq on saturday
hope the work is in pace..
hope the work is in pace..
I travelled in December. Electrification is mentioned in pink book so, they will start this soon.
Also I would like to see following trains through this route
1) Korba-Trivandrum Express
2) Ernakulam-Bilaspur Express
3) Tirunelveli-Bilaspur...
more...
Also I would like to see following trains through this route
1) Korba-Trivandrum Express
2) Ernakulam-Bilaspur Express
3) Tirunelveli-Bilaspur...
more...