Search Forum
Blog Entry# 1757646
Posted: Mar 04 2016 (20:49)
7 Responses
Last Response: Mar 04 2016 (22:29)
7 Responses
Last Response: Mar 04 2016 (22:29)
Railways are now much worried about their line up at Jharia coal fields. DHN & ADRA Div have been request to totally stop train services in Bhojudih branch lines. Seeing the rate of increase of underground fire in the coal fields, any town or train can get vanished within seconds. Earlier Dhanbad-Jharia line was dismantled and now almost the whole branch lines might be deleted from the political map of railways. Officials said,"If the vibration of the train running above the ground matches with the frequency of the underground explosive gases formed, the effect just after a moment can be equivalent to a atom bomb." Several trains like Rajdhani, Duronto & Sampark Kranti** takes these routes. Anything can happen at any time. Population in this areas have to be shifted to other parts for safety.
2 Posts
Why suffrer for RNC shatabdi. Instead it will save 15-20 mins as Bokaro will now be faster
No Matari-Telo bypass line will make it faster but I am talking about the time period between dismantle and construction. Longer the time it takes to construct, longer RNC Shatabdi will suffer.
humari photo ke hisab se 1 km track banana hai.
Why this much time lol
Why this much time lol
DHN div k upar nirbhar hai.. Kya pata wo kab kam suru karenge..
Wo log Matari station ko telo station se jod rahe hai. Instead of a small bypass as short as 1 km.
Tabhi to 7 years ka time lagega
Tabhi to 7 years ka time lagega