Search Forum
Blog Entry# 1767095
Posted: Mar 14 2016 (20:11)
4 Responses
Last Response: Mar 15 2016 (07:22)
4 Responses
Last Response: Mar 15 2016 (07:22)
New Facilities/Technology
NR/Northern
TouristerDivyanshu^~ 329 news posts
redevelopment and modernisation plan for Delhi’s Anand Vihar and Bijwasan railway stations is set to take off soon.
After...
After...
read more... Anand Vihar and Bijwasan stations set for a revamp
The existing lands in and around Railway station premises should be effectively utilized by -3 under ground parking ,Ground Level areas and greater than 15 storied buildings have to be constructed.
Moreover the adjacent roads FLYOVER in both side of the station have to be effectively connected to the first floor level of the station so as the passengers are easily proceed to the interior platforms.
Moreover the adjacent roads FLYOVER in both side of the station have to be effectively connected to the first floor level of the station so as the passengers are easily proceed to the interior platforms.